3. Section-1500 3.2 Tests during construction TABLE 1503.2: QUALITY CONTROL TESTS PRIOR TO CONSTRUCTION S. No. Tests/ Check Frequency 1. Materials for concrete As in Table 1501.2 2. Concrete Mix Design For approval by EE 3. Grading for bedding and Joint filling sand As in Table 1503.1 4. Size and Compressive Strength of Paving blocks As per drawings 5. Subgrade and Subbase As in Table 301.5 & 401.3 6. Trial length before commencement of regular work Approval by EE 7. Design parameters(Joints Details, Pattern of laying and As per drawing End restraints) 8. Manufacturing machine or Semi mechanized method for As per contract blocks and Vibrating plate compactor The Quality Control Tests to be carried out during construction are indicated in Table 1503.3 Table 1503.3: QUALITY CONTROL TESTS DURING CONSTRUCTION S. No. Tests/ Check Frequency 1. Subgrade and Subbase As in Table 301.5 and 401.3 2. Compressive Strength of concrete (IS:516) As in Table 1501.3 3. Pattern of laying of blocks and End restraints At random (As per drawings) 4. Earthen shoulders(Width and camber) At random 5. Width of Joints between blocks At random 6. Tolerances (Level tolerance & Surface Regularity) At random 3.3 Quality Control Checks by AE/EE The Quality Control Checks to be carried out by AE / EE are indicated in Table 1503.4 TABLE 1503.4: QUALITY CONTROL CHECKS BY AE / EE S. No. Tests/ Check Frequency Designation of Inspecting Officer 1. Level and surface regularity Once for every work AE / EE 2. Dimensions of blocks (Size and thickness) - do - -do- 3. Performance of 30 m Trial length For Each Work AE/EE 4. General Workmanship -do- -do- 210
C. Do ’s and Don’ts Do’s Don’ts 1. Use only mechanised or semi-mechanised methods for manufacturing blocks and ensure that blocks are properly cured. 2. Ensure proper bedding and filling of joints using vibratory compactor. 211 Quality Assurance Handbook for Rural Roads 1. Do not use cement concrete with a characteristic compressive strength less than 30 MPa.
- Page 146 and 147: SECTION 900 149 Quality Assurance H
- Page 148 and 149: 3. Section-900 2. Lower centering g
- Page 150 and 151: 3. Section-900 C. Do’s and Don’
- Page 152 and 153: 1000 STEEL REINFORCEMENT A. Methodo
- Page 154 and 155: 3.2 Tests during construction 159 Q
- Page 156 and 157: 1100: PIPE CULVERTS A. Methodology
- Page 158 and 159: 165 Quality Assurance Handbook for
- Page 160 and 161: SECTION 1200 167 Quality Assurance
- Page 162 and 163: 3. Section-1200 A2 Substructures Th
- Page 164 and 165: 3. Section-1200 4. Provide 75 mm ce
- Page 166 and 167: 3. Section-1200 (2) Tolerances 1200
- Page 168 and 169: 3. Section-1200 3.2 Tests / checks
- Page 170 and 171: SECTION 1300 179 Quality Assurance
- Page 172 and 173: 3. Section-1300 A-3 Toe Protection
- Page 174 and 175: 3. Section-1300 2. Stones for pitch
- Page 176 and 177: SECTION 1400 187 Quality Assurance
- Page 178 and 179: 3. Section-1400 3. Give streamline
- Page 180 and 181: 3. Section-1400 2. Tests during con
- Page 182 and 183: SECTION 1500 195 Quality Assurance
- Page 184 and 185: 3. Section-1500 5 Mark location and
- Page 186 and 187: 3. Section-1500 (iv) Water Water us
- Page 188 and 189: 3. Section-1500 TABLE 1501.3: QUALI
- Page 190 and 191: 3. Section-1500 2. Check the in-sit
- Page 192 and 193: 3. Section-1500 TABLE NO. 1502.3: P
- Page 194 and 195: 3. Section-1500 1503: RECTANGULAR C
- Page 198 and 199: 3. Section-1500 1504: INTERLOCKING
- Page 200 and 201: 3. Section-1500 2. Quality Control
- Page 202 and 203: SECTION 1600 217 Quality Assurance
- Page 204 and 205: 3. Section-1600 The prescribed road
- Page 206 and 207: 3. Section-1600 C. Do’s and Don
- Page 208 and 209: 1700. TRAFFIC SIGNS AND MARKINGS A.
- Page 210 and 211: 227 Quality Assurance Handbook for
- Page 212 and 213: 231 Quality Assurance Handbook for
- Page 214 and 215: 1904 : MAINTENANCE OF BITUMINOUS SU
- Page 216 and 217: 4.6 Settlement and Upheaval 235 Qua
- Page 218 and 219: 2. Surface Finish 237 Quality Assur
- Page 220 and 221: 1908 : MAINTENANCE OF CULVERTS AND
- Page 222 and 223: 241 Quality Assurance Handbook for
- Page 224 and 225: 4. Quality Monitoring only in excep
- Page 226 and 227: 1. SECTION 100: GENERAL 1.1: Qualit
- Page 228 and 229: 249 Quality Assurance Handbook for
- Page 230 and 231: 10 5R 60 106 25 DIA WELDED 21 DIA 1
- Page 232 and 233: 4. Section-300 (b) Carry out an ins
- Page 234 and 235: 4. Section-300 Photo 1. Visual Clas
- Page 236 and 237: 259 Quality Assurance Handbook for
- Page 238 and 239: Test 1 261 Quality Assurance Handbo
- Page 240 and 241: 4. Section-500 (iii) Check the aggr
- Page 242 and 243: 5. SECTION 1100:PIPE CULVERTS 267 Q
- Page 244 and 245: 6. SECTION 1300: PROTECTION WORKS A
C. Do ’s and Don’ts<br />
Do’s Don’ts<br />
1. Use only mechanised or semi-mechanised methods<br />
<strong>for</strong> manufacturing blocks and ensure that blocks are<br />
properly cured.<br />
2. Ensure proper bedding and filling of joints using<br />
vibratory compactor.<br />
211<br />
<strong>Quality</strong> <strong>Assurance</strong> <strong>Handbook</strong> <strong>for</strong> <strong>Rural</strong> <strong>Roads</strong><br />
1. Do not use cement concrete with a characteristic<br />
compressive strength less than 30 MPa.