3. Section-1500<br />
TABLE 1501.3: QUALITY CONTROL TESTS DURING CONSTRUCTION<br />
S. No. Tests / Check Frequency<br />
1. Subgrade & Subbase As in Tables 301.5 & 401.3<br />
2. Gradation and moisture content of aggregate <strong>for</strong><br />
CC pavement<br />
Minimum once per day.<br />
3. Concrete workability (Slump cone tests IS:1199) One test per 3 cum of concrete at paving site.<br />
4. Strength of Concrete (IS:516) Minimum 6 cubes and 6 beams (3 each <strong>for</strong><br />
7 day & 28 day strength) per day.<br />
5. Straightness of side <strong>for</strong>ms (steel)(For paralleling and<br />
possible settlement and securing position be<strong>for</strong>e concreting)<br />
To be checked daily<br />
6. Size, spacing, paralleling of Dowel bars and location of To be checked prior to casting of concrete at<br />
different joints the location.<br />
7. Batching and Mixing of materials Check <strong>for</strong> measurements and proper mixing<br />
8. Hot/Cold weather concreting including compaction Checks Regularly<br />
9. Compaction equipment (Needle, Screed and Plate vibrators) For continuous working and stand by<br />
arrangement<br />
10. Separation membrane (thickness and laying) Prior to laying of pavement concrete<br />
11. Levels and Alignment<br />
(i) Level tolerance Clause 1802.3; to be checked <strong>for</strong> each day’s<br />
work<br />
(ii) Surface Regularity (Transverse and Longitudinal<br />
including camber/cross slope)<br />
Regularly<br />
(iii) Width of pavement and position of paving edges<br />
work Regularly at grid points<br />
Clause 1802.2; to be checked <strong>for</strong> each day’s<br />
(iv) Pavement thickness To be checked <strong>for</strong> each day’s work<br />
(v) Alignment of joints -do-<br />
(vi) Depth of Dowel Bars -do-<br />
(vii) Texturing and Edging -do<br />
6.3 <strong>Quality</strong> Control Checks By AE / EE<br />
The quality control checks to be carried out be AE/EE are indicated in Table 1501.4<br />
TABLE 1501.4: QUALITY CONTROL CHECKS BY AE/EE<br />
S. No. Tests Frequency Designation of<br />
Inspecting Officer<br />
1. Review of cube and beam<br />
test data<br />
Regularly AE<br />
2. <strong>Quality</strong> Checks by AE / EE<br />
- Width thickness of pavement At random AE<br />
- Surface levels -do- AE<br />
- Surface regularity -do- AE<br />
- Surface texture -do- AE<br />
- Transverse joints Every Joint AE<br />
3. Joints (Expansion / Contraction)<br />
- Joint alignment, dimensions & filling of joints Every joint AE/EE<br />
- Cracking of slabs Cracked slabs AE/EE<br />
4. Paving near culverts and bridges At each site AE/EE<br />
5. Per<strong>for</strong>mance of 30 m Trial length For each work EE<br />