3. Section-1500<br />

TABLE 1501.3: QUALITY CONTROL TESTS DURING CONSTRUCTION<br />

S. No. Tests / Check Frequency<br />

1. Subgrade & Subbase As in Tables 301.5 & 401.3<br />

2. Gradation and moisture content of aggregate <strong>for</strong><br />

CC pavement<br />

Minimum once per day.<br />

3. Concrete workability (Slump cone tests IS:1199) One test per 3 cum of concrete at paving site.<br />

4. Strength of Concrete (IS:516) Minimum 6 cubes and 6 beams (3 each <strong>for</strong><br />

7 day & 28 day strength) per day.<br />

5. Straightness of side <strong>for</strong>ms (steel)(For paralleling and<br />

possible settlement and securing position be<strong>for</strong>e concreting)<br />

To be checked daily<br />

6. Size, spacing, paralleling of Dowel bars and location of To be checked prior to casting of concrete at<br />

different joints the location.<br />

7. Batching and Mixing of materials Check <strong>for</strong> measurements and proper mixing<br />

8. Hot/Cold weather concreting including compaction Checks Regularly<br />

9. Compaction equipment (Needle, Screed and Plate vibrators) For continuous working and stand by<br />

arrangement<br />

10. Separation membrane (thickness and laying) Prior to laying of pavement concrete<br />

11. Levels and Alignment<br />

(i) Level tolerance Clause 1802.3; to be checked <strong>for</strong> each day’s<br />

work<br />

(ii) Surface Regularity (Transverse and Longitudinal<br />

including camber/cross slope)<br />

Regularly<br />

(iii) Width of pavement and position of paving edges<br />

work Regularly at grid points<br />

Clause 1802.2; to be checked <strong>for</strong> each day’s<br />

(iv) Pavement thickness To be checked <strong>for</strong> each day’s work<br />

(v) Alignment of joints -do-<br />

(vi) Depth of Dowel Bars -do-<br />

(vii) Texturing and Edging -do<br />

6.3 <strong>Quality</strong> Control Checks By AE / EE<br />

The quality control checks to be carried out be AE/EE are indicated in Table 1501.4<br />

TABLE 1501.4: QUALITY CONTROL CHECKS BY AE/EE<br />

S. No. Tests Frequency Designation of<br />

Inspecting Officer<br />

1. Review of cube and beam<br />

test data<br />

Regularly AE<br />

2. <strong>Quality</strong> Checks by AE / EE<br />

- Width thickness of pavement At random AE<br />

- Surface levels -do- AE<br />

- Surface regularity -do- AE<br />

- Surface texture -do- AE<br />

- Transverse joints Every Joint AE<br />

3. Joints (Expansion / Contraction)<br />

- Joint alignment, dimensions & filling of joints Every joint AE/EE<br />

- Cracking of slabs Cracked slabs AE/EE<br />

4. Paving near culverts and bridges At each site AE/EE<br />

5. Per<strong>for</strong>mance of 30 m Trial length For each work EE<br />