165<br />

<strong>Quality</strong> <strong>Assurance</strong> <strong>Handbook</strong> <strong>for</strong> <strong>Rural</strong> <strong>Roads</strong><br />

pipe. Make a continuous layer of well compacted sand, moorum or approved granular<br />

material, passing 5.6 mm sieve and shaped concentrically, to fit the lower part of the pipe<br />

exterior <strong>for</strong> a minimum 10 per cent of its overall height. The compacted thickness of the<br />

granular bedding layer shall not be less than 75 mm.<br />

(iii) For expansive soils, provide a layer of sand/moorum on non-expansive material of minimum<br />

450 mm thickness under the bedding.<br />

3 Back filling<br />

(i) The back fill of soil shall be clean from borders, large roots, clay lumps retained on 75 mm<br />

sieve, stones retained on 26.5 mm sieve and excessive amounts of sods and other vegetable<br />

matter.<br />

4 Tolerances<br />

The following tolerances are permitted <strong>for</strong> concrete pipes as per IS 458<br />

i. Overall length ±1 percent of standard length<br />

ii. Internal dia ±10 mm<br />

iii. Barrel thickness<br />

80-95 mm + 5 mm<br />

-2.5 mm<br />

Over 95 mm +7 mm<br />

-3.5 mm<br />

5. <strong>Quality</strong> Control Tests<br />

5.1 Tests prior to construction<br />

The quality control tests to be carried out prior to construction are indicated in Table 1100.1.<br />

TABLE 1100.1: QUALITY CONTROL TESTS PRIOR TO CONSTRUCTION<br />

S.No. Material / Work Test / Check Frequency<br />

1. Bricks As in Table 600.6 As in Table 600.6<br />

2. Stones As in Table 700.6 As in Table 700.6<br />

3. Concrete Pipe - Dimensions At factory be<strong>for</strong>e delivery<br />

- Manufacturing defects<br />

- Tolerances (IS:458)<br />

- Three edge bearing test (IS:3597) Manufacturer’s certificate<br />

5.2 Tests / Checks during construction<br />

The <strong>Quality</strong> Control Tests / checks to be carried out during construction are indicated in Table<br />

1100.2.