900 FORMWORK AND SURFACE FINISH FOR STRUCTURES<br />

A Methodology<br />

A 1 Design and Erection<br />

151<br />

<strong>Quality</strong> <strong>Assurance</strong> <strong>Handbook</strong> <strong>for</strong> <strong>Rural</strong> <strong>Roads</strong><br />

1. Examine all materials and components used <strong>for</strong> <strong>for</strong>mwork, <strong>for</strong> damage or excessive deterioration<br />

be<strong>for</strong>e use and reuse only if found suitable after repairs.<br />

2. For timber <strong>for</strong>mwork, inspect <strong>for</strong> physical damages, besides signs of attack by decay, rot or insect<br />

attack or development of splits.<br />

3. Use familiar materials like timber, steel, plywood, concrete and masonry <strong>for</strong> false work. For metal<br />

<strong>for</strong>ms, the thickness should be adequate to keep them true to shape. Use counter sunk bolts and<br />

permit use of approved internal steel ties or steel or plastic spacers.<br />

4. Ensure false work (<strong>for</strong>mwork + temporary support system) is designed to meet the requirements<br />

of permanent structure including ease of erection and dismantling and is approved by the Engineer.<br />

5. Provide proper and safe access to all parts of <strong>for</strong>mwork <strong>for</strong> inspection.<br />

6. Make the <strong>for</strong>mwork robust and use ballies of 100 mm dia of heights not more than 4 m. Provide<br />

cross and diagonal bracings of 75 mm dia (ballies) in both directions. For metal <strong>for</strong>ms, the diagonal<br />

bracings shall be of the same size of angles used <strong>for</strong> columns.<br />

7. Check <strong>for</strong> design deficiencies such as shoring or reshoring, insufficient allowance <strong>for</strong> unsymmetrical<br />

or eccentric loading due to placement sequence of concrete.<br />

8. Pay attention to detailing which otherwise may cause instability, local failure or progressive<br />

collapse. Lay emphasis on attention to details.<br />

9. In case of false work erected on normal ground, ensure distribution of loading to the ground,<br />

through timber or base plates to avoid differential settlement.<br />

10. Control the alignment of the distribution members, so that shores of the falsework system are<br />

centrally placed on the member.<br />

11. Make the <strong>for</strong>ms tight and sufficiently rigid by the use of ties and bracings to prevent any<br />

displacement or sagging between the supports.<br />

A 2 Preparation be<strong>for</strong>e concreting<br />

1. Apply a coat of oil or grease as release agent, inside the surfaces of <strong>for</strong>ms to prevent adhesion of<br />

concrete to <strong>for</strong>mwork.<br />

2. Make the <strong>for</strong>mwork leak proof to prevent escape of cement slurry during compaction with vibrators.<br />

Clean the <strong>for</strong>ms thoroughly just be<strong>for</strong>e concreting.<br />

3. Line <strong>for</strong>mwork with a proven material to provide smooth finish of uni<strong>for</strong>m texture and appearance,<br />

without leaving stain on concrete.<br />

A 3 Removal of Formwork<br />

1. Plan removal of <strong>for</strong>mwork (deshuttering and decentering) in advance. Give due consideration to<br />

the local conditions viz. character of structure, weather and materials used in mix.