C. Do’s and Don’ts<br />

Do’s Don’ts<br />

1. Ensure that aggregates <strong>for</strong> premix carpet and seal<br />

coat con<strong>for</strong>m to the prescribed physical and grading<br />

requirements and are clean and dry.<br />

2. Exercise strict control over mixing and laying<br />

temperature as per specifications using appropriate<br />

thermometers.<br />

3. Rolling operations should be completed be<strong>for</strong>e the<br />

temperature of the mix falls below 100oC.<br />

508.2 PREMIX CARPET USING BITUMEN EMULSION<br />

A. Methodology<br />

105<br />

<strong>Quality</strong> <strong>Assurance</strong> <strong>Handbook</strong> <strong>for</strong> <strong>Rural</strong> <strong>Roads</strong><br />

1. Do not allow manual mixing.<br />

2. Do not undertake the work in foggy, rainy or windy<br />

weather or when the atmospheric temperature in the<br />

shade is less than 10oC or when the surface is wet.<br />

3. Do not allow the premix material to adhere to the roller<br />

wheels. Do not use excess water <strong>for</strong> the purpose. Light<br />

sprinkling should do.<br />

4. Do not allow the roller to stand on newly laid material.<br />

5. Do not allow any traffic without laying seal coat over<br />

the premix carpet.<br />

1. Prepare the base on which premix carpet is to be laid to the specified lines, grade and cross section<br />

2. Apply a tack coat over an existing prepared black top surface.<br />

3. The quantities of material required <strong>for</strong> 20 mm thick premix carpet should be as indicated below<br />

(i) Aggregate as per Table 508.1.1 of Sub-section 508.1<br />

(ii) Binder : Cationic Bitumen Emulsion<br />

(a) For 0.18 m3 of 13.2 mm nominal size stone at 78 kg 14.0 kg<br />

cationic bitumen emulsion per m3<br />

(b) For 0.09 m3 of 11.2 mm nominal size stone at 84 kg 7.5 kg<br />

cationic bitumen emulsion per m3<br />

Total 21.5 kg<br />

4. Premix bitumen emulsion and aggregates in a suitable mixture such as cold mixing plant as per<br />

IS:5435 (revised) or concrete mixture<br />

5. Spread the premix to the desired thickness, grade, cross fall within 10 minutes of applying the<br />

tack coat and ensure that all levelling, raking is completed within 20 minutes of the mixing.<br />

6. Roll the surface as per Para 6 & 7 of the methodology described in Sub-section 508.1<br />

7. Provide a seal coat as specified in the contract within 4-6 hours after laying the premix carpet.<br />

Follow Sub-section 510 <strong>for</strong> the work on seal coat.<br />

8. Preferably, the road should be opened to traffic after 24 hours of laying the seal coat. In single lane<br />

roads traffic may ordinarily be allowed after 6-8 hours with the care that the speed is rigorously<br />

restricted to not more than 16 km/h.