Recycling Treated Municipal Wastewater for Industrial Water Use
Recycling Treated Municipal Wastewater for Industrial Water Use Recycling Treated Municipal Wastewater for Industrial Water Use
MCES Recycling Treated Wastewater for Industrial Reuse Project Meeting Agenda Meeting: Industrial Stakeholders Meeting No.: MP03 Date: 3/08/07 Location: Metro 94, Rm 32 South Time: 1:00 – 4:00 pm 455 Etna St Suite 32, St. Paul 1:00 pm Introductions – Deborah Manning, MCES 1:10 pm Meeting Objectives – Deborah Manning 1:15 pm Project Overview – Patti Craddock, Craddock Consulting Engineers 1:25 pm Water Use Survey – Patti Craddock 1:30 pm Discussion – Bob Matthews, CDM • Format and Roles • Questions to Address What issues/concerns do you have with using a reclaimed water supply? If you site a new facility, what features would encourage you to use a reclaimed water supply? 2:30 pm Break 2:40 pm Discussion (Continued) 3:30 pm Q&A – Patti Craddock 3:45 pm Summary – Patti Craddock • Recap • Action Items Adjourn MCES Project No. 070186 Page 1 of 1 CCE Project No. 06002 CDM Project No. 42588-5085 WWReuse IndustryStakeholderMtg_agenda_030807.doc
Recycling Treated Wastewater For Industrial Water Use in MN March 8, 2007 Industry Stakeholder Workshop Issues Table Technical Issues Topic Discussion Reliability • Most industries will require a backup supply; assume can keep existing supply as a backup. • Envision reclaimed supply for a portion of the facility’s water uses; want the flexibility of multiple supplies. • Reclaimed water may provide a water supply to areas with groundwater contamination. It is possible that pumping could be restricted in some areas with contamination and an industry may not be able to meet their water supply needs with their well system. Reclaimed water would provide a constant source (emphasizes need for multiple supplies or interconnections between water supply systems in times of emergency). Pressure • Many industries would want some type of storage facility to provide them the flexibility to meet various pressure requirements. • Many have this in their system now and would expect to keep this for flexibility. • There were no specific pressure requirements of concern noted – industries handle this issue now. Water Quantity • Need detailed information on supply availability to understand diurnal, weekly, and seasonal patterns; previous inquiries with a WWTP by an industry indicated this data was lacking. • Will there be reservoirs in the system? (depends on demand/supply of specific application; other states have storage for seasonal use [irrigation] and diurnal flow variability) • Issue: Who owns the water? o Is it the municipality or the state? o Who does industry go to for appropriation? o This issue surfaced at the regulatory meeting in Mar06 o Comment from DNR: if water is piped to another entity, there would be no additional permit process; if the water is put back into the ground or surface water, then a DNR appropriations permit would be required. o Need further discussion on this with DNR. • Industries can also provide a water supply: o Kraemer Mining quarry reservoirs are currently under evaluation as a municipal water supply. Looking to provide a water treatment plant. o Rock Tenn Co discharges good water source as cooling water and is a potential supply. ExhB-Issues Tables_frMar0807 Ind Stakeh Mtg-FINAL.doc Page 1 of 5
- Page 533 and 534: Secondary Treatment Assumptions Sus
- Page 535 and 536: Secondary Treatment Assumptions Sus
- Page 537 and 538: Secondary Treatment Assumptions Sus
- Page 539 and 540: Secondary Treatment Assumptions Sus
- Page 541 and 542: Craddock Consulting Engineers 1 In
- Page 543 and 544: TM4: WWTP Effluent Quality Recyclin
- Page 545 and 546: !( !( !( !( !( !( !( !( !( !( !( !(
- Page 547 and 548: TM4: WWTP Effluent Quality Recyclin
- Page 549 and 550: Frequency of Occurrence, % Frequenc
- Page 551 and 552: No. of Plants Total Permitting Desi
- Page 553 and 554: TM4: WWTP Effluent Quality Recyclin
- Page 555 and 556: !( !( !( !( !( !( !( !( !( !( !( !(
- Page 557 and 558: TM4: WWTP Effluent Quality Recyclin
- Page 559 and 560: Frequency of Occurrence, % Frequenc
- Page 561 and 562: No. of Plants Total Permitting Desi
- Page 563 and 564: TM4: WWTP Effluent Quality Recyclin
- Page 565 and 566: !( !( !( !( !( !( !( !( !( !( !( !(
- Page 567 and 568: TM4: WWTP Effluent Quality Recyclin
- Page 569 and 570: Craddock Consulting Engineers 1 In
- Page 571 and 572: 1.0 Introduction This technical mem
- Page 573 and 574: Exhibit A Regulatory Stakeholder Me
- Page 575 and 576: MCES Recycling Treated Wastewater f
- Page 577 and 578: MCES Recycling Treated Wastewater f
- Page 579 and 580: Municipal Wastewater Reuse Regulato
- Page 581 and 582: MCES Recycling Treated Wastewater f
- Page 583: Exhibit B Industry Stakeholder Meet
- Page 587 and 588: Institutional Issues Topic Discussi
- Page 589 and 590: Institutional Issues Topic Discussi
- Page 591 and 592: Recycling Treated Wastewater For In
- Page 593 and 594: Recycling Treated Wastewater For In
- Page 595 and 596: Recycling Treated Wastewater For In
- Page 597 and 598: Recycling Treated Wastewater For In
- Page 599 and 600: Exhibit C Broader Base Stakeholder
- Page 601 and 602: Recycling Treated Wastewater For In
- Page 603 and 604: Recycling Treated Wastewater For In
- Page 605 and 606: Recycling Treated Wastewater For In
- Page 607 and 608: Recycling Treated Wastewater For In
- Page 609 and 610: Recycling Treated Wastewater For In
- Page 611 and 612: Recycling Treated Wastewater For In
MCES <strong>Recycling</strong> <strong>Treated</strong> <strong>Wastewater</strong> <strong>for</strong> <strong>Industrial</strong> Reuse Project<br />
Meeting Agenda<br />
Meeting: <strong>Industrial</strong> Stakeholders<br />
Meeting No.: MP03 Date: 3/08/07<br />
Location: Metro 94, Rm 32 South Time: 1:00 – 4:00 pm<br />
455 Etna St Suite 32, St. Paul<br />
1:00 pm Introductions – Deborah Manning, MCES<br />
1:10 pm Meeting Objectives – Deborah Manning<br />
1:15 pm Project Overview – Patti Craddock, Craddock Consulting Engineers<br />
1:25 pm <strong>Water</strong> <strong>Use</strong> Survey – Patti Craddock<br />
1:30 pm Discussion – Bob Matthews, CDM<br />
• Format and Roles<br />
• Questions to Address<br />
What issues/concerns do you have with using a reclaimed water supply?<br />
If you site a new facility, what features would encourage you to use a<br />
reclaimed water supply?<br />
2:30 pm Break<br />
2:40 pm Discussion (Continued)<br />
3:30 pm Q&A – Patti Craddock<br />
3:45 pm Summary – Patti Craddock<br />
• Recap<br />
• Action Items<br />
Adjourn<br />
MCES Project No. 070186 Page 1 of 1<br />
CCE Project No. 06002<br />
CDM Project No. 42588-5085 WWReuse IndustryStakeholderMtg_agenda_030807.doc