Diam (in) Annual Average Day Flow (mgd) Annual Average Day Peak Hourly Flow (gpm) Flow (mgd) Pipe Velocity at Peak Hourly Flow (fps) Pipe Unit Project Cost ($/ft) 42 11.67 8098.98 35.01 5.63 531 42 12.00 8328.00 36.00 5.79 531 42 12.33 8557.02 36.99 5.95 531 42 12.67 8792.98 38.01 6.11 531 42 13.00 9022.00 39.00 6.27 531 42 13.33 9251.02 39.99 6.43 531 42 13.67 9486.98 41.01 6.59 531 42 14.00 9716.00 42.00 6.75 531 42 14.67 10180.98 44.01 7.08 531 48 13.67 9486.98 41.01 5.05 671 48 14.00 9716.00 42.00 5.17 671 48 14.33 9945.02 42.99 5.29 671 48 14.67 10180.98 44.01 5.42 671 48 15.00 10410.00 45.00 5.54 671 48 15.33 10639.02 45.99 5.66 671 48 15.67 10874.98 47.01 5.79 671 48 16.00 11104.00 48.00 5.91 671 48 16.33 11333.02 48.99 6.03 671 48 16.67 11568.98 50.01 6.16 671 48 17.33 12027.02 51.99 6.40 671 48 18.00 12492.00 54.00 6.65 671 48 18.33 12721.02 54.99 6.77 671 48 19.00 13186.00 57.00 7.02 671 54 17.33 12027.02 51.99 5.06 781 54 18.00 12492.00 54.00 5.25 781 54 18.67 12956.98 56.01 5.45 781 54 19.33 13415.02 57.99 5.64 781 54 20.00 13880.00 60.00 5.84 781 54 20.67 14344.98 62.01 6.03 781 54 21.33 14803.02 63.99 6.22 781 54 22.00 15268.00 66.00 6.42 781 54 22.67 15732.98 68.01 6.62 781 54 23.33 16191.02 69.99 6.81 781 54 24.00 16656.00 72.00 7.00 781 60 21.17 14691.98 63.51 5.00 891 60 21.67 15038.98 65.01 5.12 891 60 22.33 15497.02 66.99 5.28 891 60 23.00 15962.00 69.00 5.44 891 60 23.67 16426.98 71.01 5.60 891 60 24.33 16885.02 72.99 5.75 891 60 25.00 17350.00 75.00 5.91 891 60 25.67 17814.98 77.01 6.07 891 60 26.33 18273.02 78.99 6.22 891 60 27.00 18738.00 81.00 6.38 891 60 27.67 19202.98 83.01 6.54 891 60 28.33 19661.02 84.99 6.70 891 60 29.00 20126.00 87.00 6.86 891 60 30.00 20820.00 90.00 7.09 891 Capital PROJECT Cost Curves for Reclaimed Transmission Piping Urban - Annualized Capital Cost - $/yr 1 1.5 2 2.5 3 3.5 4 4.5 5 10 $216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041 $216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041 $216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041 $216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041 $216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041 $216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041 $216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041 $216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041 $216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $273,460 $410,190 $546,920 $683,649 $820,379 $957,109 $1,093,839 $1,230,569 $1,367,299 $2,734,598 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $318,289 $477,434 $636,578 $795,723 $954,868 $1,114,012 $1,273,157 $1,432,302 $1,591,446 $3,182,892 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 $363,119 $544,678 $726,237 $907,797 $1,089,356 $1,270,915 $1,452,475 $1,634,034 $1,815,594 $3,631,187 Pipe Capital Costs_Single_PF of 3_FINAL.xls, Capital Costs Page 4 of 6 3/30/2007 2:55 PM

Diam (in) Annual Average Day Flow Annual Average Day Pipe Velocity at Peak Pipe Unit Hourly Flow Project (fps) Cost ($/ft) (mgd) Flow (gpm) Peak Hourly Flow (mgd) 4 0.10 69.40 0.30 5.32 97 6 0.20 138.80 0.60 4.73 106 6 0.27 187.38 0.81 6.38 106 8 0.40 277.60 1.20 5.32 115 8 0.47 326.18 1.41 6.25 115 8 0.53 367.82 1.59 7.05 115 10 0.60 416.40 1.80 5.11 128 10 0.67 464.98 2.01 5.70 128 10 0.83 576.02 2.49 7.06 128 12 0.93 645.42 2.79 5.50 140 12 1.00 694.00 3.00 5.91 140 12 1.17 811.98 3.51 6.91 140 14 1.33 923.02 3.99 5.77 157 14 1.50 1041.00 4.50 6.51 157 14 1.67 1158.98 5.01 7.25 157 16 1.83 1270.02 5.49 6.08 189 16 2.00 1388.00 6.00 6.65 189 16 2.07 1436.58 6.21 6.88 189 18 2.17 1505.98 6.51 5.70 211 18 2.33 1617.02 6.99 6.12 211 18 2.50 1735.00 7.50 6.57 211 18 2.67 1852.98 8.01 7.01 211 20 2.83 1964.02 8.49 6.02 236 20 3.00 2082.00 9.00 6.38 236 20 3.17 2199.98 9.51 6.74 236 20 3.33 2311.02 9.99 7.08 236 24 3.50 2429.00 10.50 5.17 284 24 3.67 2546.98 11.01 5.42 284 24 3.83 2658.02 11.49 5.66 284 24 4.00 2776.00 12.00 5.91 284 24 4.17 2893.98 12.51 6.16 284 24 4.33 3005.02 12.99 6.40 284 24 4.50 3123.00 13.50 6.65 284 24 4.67 3240.98 14.01 6.90 284 30 5.33 3699.02 15.99 5.04 353 30 5.67 3934.98 17.01 5.36 353 30 6.00 4164.00 18.00 5.67 353 30 6.33 4393.02 18.99 5.99 353 30 6.67 4628.98 20.01 6.31 353 30 7.00 4858.00 21.00 6.62 353 30 7.33 5087.02 21.99 6.93 353 36 8.00 5552.00 24.00 5.25 434 36 8.33 5781.02 24.99 5.47 434 36 8.67 6016.98 26.01 5.69 434 36 9.00 6246.00 27.00 5.91 434 36 9.33 6475.02 27.99 6.13 434 36 9.67 6710.98 29.01 6.35 434 36 10.00 6940.00 30.00 6.57 434 36 10.33 7169.02 30.99 6.78 434 36 10.50 7287.00 31.50 6.89 434 36 10.67 7404.98 32.01 7.01 434 42 11.33 7863.02 33.99 5.47 531 Capital PROJECT Cost Curves for Reclaimed Transmission Piping Urban Capital Cost - Cost per 1000 gallons 1 1.5 2 2.5 3 3.5 4 5 10 $1.08 $1.62 $2.17 $2.71 $3.25 $3.79 $4.33 $4.87 $5.42 $10.83 $0.59 $0.89 $1.18 $1.48 $1.78 $2.07 $2.37 $2.66 $2.96 $5.92 $0.44 $0.66 $0.88 $1.10 $1.32 $1.53 $1.75 $1.97 $2.19 $4.38 $0.32 $0.48 $0.64 $0.80 $0.96 $1.12 $1.28 $1.44 $1.61 $3.21 $0.27 $0.41 $0.55 $0.68 $0.82 $0.96 $1.09 $1.23 $1.37 $2.73 $0.24 $0.36 $0.48 $0.61 $0.73 $0.85 $0.97 $1.09 $1.21 $2.42 $0.24 $0.36 $0.48 $0.60 $0.71 $0.83 $0.95 $1.07 $1.19 $2.38 $0.21 $0.32 $0.43 $0.53 $0.64 $0.75 $0.85 $0.96 $1.07 $2.13 $0.17 $0.26 $0.34 $0.43 $0.52 $0.60 $0.69 $0.77 $0.86 $1.72 $0.17 $0.25 $0.34 $0.42 $0.50 $0.59 $0.67 $0.76 $0.84 $1.68 $0.16 $0.23 $0.31 $0.39 $0.47 $0.55 $0.63 $0.70 $0.78 $1.56 $0.13 $0.20 $0.27 $0.33 $0.40 $0.47 $0.53 $0.60 $0.67 $1.34 $0.13 $0.20 $0.26 $0.33 $0.40 $0.46 $0.53 $0.59 $0.66 $1.32 $0.12 $0.18 $0.23 $0.29 $0.35 $0.41 $0.47 $0.53 $0.58 $1.17 $0.10 $0.16 $0.21 $0.26 $0.31 $0.37 $0.42 $0.47 $0.52 $1.05 $0.12 $0.17 $0.23 $0.29 $0.35 $0.40 $0.46 $0.52 $0.58 $1.15 $0.11 $0.16 $0.21 $0.26 $0.32 $0.37 $0.42 $0.47 $0.53 $1.06 $0.10 $0.15 $0.20 $0.25 $0.31 $0.36 $0.41 $0.46 $0.51 $1.02 $0.11 $0.16 $0.22 $0.27 $0.33 $0.38 $0.43 $0.49 $0.54 $1.09 $0.10 $0.15 $0.20 $0.25 $0.30 $0.35 $0.40 $0.46 $0.51 $1.01 $0.09 $0.14 $0.19 $0.24 $0.28 $0.33 $0.38 $0.42 $0.47 $0.94 $0.09 $0.13 $0.18 $0.22 $0.26 $0.31 $0.35 $0.40 $0.44 $0.88 $0.09 $0.14 $0.19 $0.23 $0.28 $0.33 $0.37 $0.42 $0.47 $0.93 $0.09 $0.13 $0.18 $0.22 $0.26 $0.31 $0.35 $0.40 $0.44 $0.88 $0.08 $0.12 $0.17 $0.21 $0.25 $0.29 $0.33 $0.37 $0.42 $0.83 $0.08 $0.12 $0.16 $0.20 $0.24 $0.28 $0.32 $0.36 $0.40 $0.79 $0.09 $0.14 $0.18 $0.23 $0.27 $0.32 $0.36 $0.41 $0.45 $0.91 $0.09 $0.13 $0.17 $0.22 $0.26 $0.30 $0.35 $0.39 $0.43 $0.86 $0.08 $0.12 $0.17 $0.21 $0.25 $0.29 $0.33 $0.37 $0.41 $0.83 $0.08 $0.12 $0.16 $0.20 $0.24 $0.28 $0.32 $0.36 $0.40 $0.79 $0.08 $0.11 $0.15 $0.19 $0.23 $0.27 $0.30 $0.34 $0.38 $0.76 $0.07 $0.11 $0.15 $0.18 $0.22 $0.26 $0.29 $0.33 $0.37 $0.73 $0.07 $0.11 $0.14 $0.18 $0.21 $0.25 $0.28 $0.32 $0.35 $0.70 $0.07 $0.10 $0.14 $0.17 $0.20 $0.24 $0.27 $0.31 $0.34 $0.68 $0.07 $0.11 $0.15 $0.18 $0.22 $0.26 $0.30 $0.33 $0.37 $0.74 $0.07 $0.10 $0.14 $0.17 $0.21 $0.24 $0.28 $0.31 $0.35 $0.70 $0.07 $0.10 $0.13 $0.16 $0.20 $0.23 $0.26 $0.30 $0.33 $0.66 $0.06 $0.09 $0.12 $0.16 $0.19 $0.22 $0.25 $0.28 $0.31 $0.62 $0.06 $0.09 $0.12 $0.15 $0.18 $0.21 $0.24 $0.27 $0.30 $0.59 $0.06 $0.08 $0.11 $0.14 $0.17 $0.20 $0.23 $0.25 $0.28 $0.56 $0.05 $0.08 $0.11 $0.13 $0.16 $0.19 $0.22 $0.24 $0.27 $0.54 $0.06 $0.09 $0.12 $0.15 $0.18 $0.21 $0.24 $0.27 $0.30 $0.61 $0.06 $0.09 $0.12 $0.15 $0.17 $0.20 $0.23 $0.26 $0.29 $0.58 $0.06 $0.08 $0.11 $0.14 $0.17 $0.20 $0.22 $0.25 $0.28 $0.56 $0.05 $0.08 $0.11 $0.13 $0.16 $0.19 $0.22 $0.24 $0.27 $0.54 $0.05 $0.08 $0.10 $0.13 $0.16 $0.18 $0.21 $0.23 $0.26 $0.52 $0.05 $0.08 $0.10 $0.13 $0.15 $0.18 $0.20 $0.23 $0.25 $0.50 $0.05 $0.07 $0.10 $0.12 $0.15 $0.17 $0.19 $0.22 $0.24 $0.48 $0.05 $0.07 $0.09 $0.12 $0.14 $0.16 $0.19 $0.21 $0.23 $0.47 $0.05 $0.07 $0.09 $0.12 $0.14 $0.16 $0.18 $0.21 $0.23 $0.46 $0.05 $0.07 $0.09 $0.11 $0.14 $0.16 $0.18 $0.20 $0.23 $0.45 $0.05 $0.08 $0.10 $0.13 $0.16 $0.18 $0.21 $0.24 $0.26 $0.52 Pipe Capital Costs_Single_PF of 3_FINAL.xls, Capital Costs Page 5 of 6 3/30/2007 2:55 PM

Diam (in)<br />

Annual<br />

Average<br />

Day Flow<br />

Annual<br />

Average Day<br />

Pipe Velocity<br />

at Peak Pipe Unit<br />

Hourly Flow Project<br />

(fps) Cost ($/ft)<br />

(mgd) Flow (gpm)<br />

Peak Hourly<br />

Flow (mgd)<br />

4 0.10 69.40 0.30 5.32 97<br />

6 0.20 138.80 0.60 4.73 106<br />

6 0.27 187.38 0.81 6.38 106<br />

8 0.40 277.60 1.20 5.32 115<br />

8 0.47 326.18 1.41 6.25 115<br />

8 0.53 367.82 1.59 7.05 115<br />

10 0.60 416.40 1.80 5.11 128<br />

10 0.67 464.98 2.01 5.70 128<br />

10 0.83 576.02 2.49 7.06 128<br />

12 0.93 645.42 2.79 5.50 140<br />

12 1.00 694.00 3.00 5.91 140<br />

12 1.17 811.98 3.51 6.91 140<br />

14 1.33 923.02 3.99 5.77 157<br />

14 1.50 1041.00 4.50 6.51 157<br />

14 1.67 1158.98 5.01 7.25 157<br />

16 1.83 1270.02 5.49 6.08 189<br />

16 2.00 1388.00 6.00 6.65 189<br />

16 2.07 1436.58 6.21 6.88 189<br />

18 2.17 1505.98 6.51 5.70 211<br />

18 2.33 1617.02 6.99 6.12 211<br />

18 2.50 1735.00 7.50 6.57 211<br />

18 2.67 1852.98 8.01 7.01 211<br />

20 2.83 1964.02 8.49 6.02 236<br />

20 3.00 2082.00 9.00 6.38 236<br />

20 3.17 2199.98 9.51 6.74 236<br />

20 3.33 2311.02 9.99 7.08 236<br />

24 3.50 2429.00 10.50 5.17 284<br />

24 3.67 2546.98 11.01 5.42 284<br />

24 3.83 2658.02 11.49 5.66 284<br />

24 4.00 2776.00 12.00 5.91 284<br />

24 4.17 2893.98 12.51 6.16 284<br />

24 4.33 3005.02 12.99 6.40 284<br />

24 4.50 3123.00 13.50 6.65 284<br />

24 4.67 3240.98 14.01 6.90 284<br />

30 5.33 3699.02 15.99 5.04 353<br />

30 5.67 3934.98 17.01 5.36 353<br />

30 6.00 4164.00 18.00 5.67 353<br />

30 6.33 4393.02 18.99 5.99 353<br />

30 6.67 4628.98 20.01 6.31 353<br />

30 7.00 4858.00 21.00 6.62 353<br />

30 7.33 5087.02 21.99 6.93 353<br />

36 8.00 5552.00 24.00 5.25 434<br />

36 8.33 5781.02 24.99 5.47 434<br />

36 8.67 6016.98 26.01 5.69 434<br />

36 9.00 6246.00 27.00 5.91 434<br />

36 9.33 6475.02 27.99 6.13 434<br />

36 9.67 6710.98 29.01 6.35 434<br />

36 10.00 6940.00 30.00 6.57 434<br />

36 10.33 7169.02 30.99 6.78 434<br />

36 10.50 7287.00 31.50 6.89 434<br />

36 10.67 7404.98 32.01 7.01 434<br />

42 11.33 7863.02 33.99 5.47 531<br />

Capital PROJECT Cost Curves <strong>for</strong> Reclaimed Transmission Piping<br />

Urban Capital Cost - Cost per 1000 gallons<br />

1 1.5 2 2.5 3 3.5 4 5 10<br />

$1.08 $1.62 $2.17 $2.71 $3.25 $3.79 $4.33 $4.87 $5.42 $10.83<br />

$0.59 $0.89 $1.18 $1.48 $1.78 $2.07 $2.37 $2.66 $2.96 $5.92<br />

$0.44 $0.66 $0.88 $1.10 $1.32 $1.53 $1.75 $1.97 $2.19 $4.38<br />

$0.32 $0.48 $0.64 $0.80 $0.96 $1.12 $1.28 $1.44 $1.61 $3.21<br />

$0.27 $0.41 $0.55 $0.68 $0.82 $0.96 $1.09 $1.23 $1.37 $2.73<br />

$0.24 $0.36 $0.48 $0.61 $0.73 $0.85 $0.97 $1.09 $1.21 $2.42<br />

$0.24 $0.36 $0.48 $0.60 $0.71 $0.83 $0.95 $1.07 $1.19 $2.38<br />

$0.21 $0.32 $0.43 $0.53 $0.64 $0.75 $0.85 $0.96 $1.07 $2.13<br />

$0.17 $0.26 $0.34 $0.43 $0.52 $0.60 $0.69 $0.77 $0.86 $1.72<br />

$0.17 $0.25 $0.34 $0.42 $0.50 $0.59 $0.67 $0.76 $0.84 $1.68<br />

$0.16 $0.23 $0.31 $0.39 $0.47 $0.55 $0.63 $0.70 $0.78 $1.56<br />

$0.13 $0.20 $0.27 $0.33 $0.40 $0.47 $0.53 $0.60 $0.67 $1.34<br />

$0.13 $0.20 $0.26 $0.33 $0.40 $0.46 $0.53 $0.59 $0.66 $1.32<br />

$0.12 $0.18 $0.23 $0.29 $0.35 $0.41 $0.47 $0.53 $0.58 $1.17<br />

$0.10 $0.16 $0.21 $0.26 $0.31 $0.37 $0.42 $0.47 $0.52 $1.05<br />

$0.12 $0.17 $0.23 $0.29 $0.35 $0.40 $0.46 $0.52 $0.58 $1.15<br />

$0.11 $0.16 $0.21 $0.26 $0.32 $0.37 $0.42 $0.47 $0.53 $1.06<br />

$0.10 $0.15 $0.20 $0.25 $0.31 $0.36 $0.41 $0.46 $0.51 $1.02<br />

$0.11 $0.16 $0.22 $0.27 $0.33 $0.38 $0.43 $0.49 $0.54 $1.09<br />

$0.10 $0.15 $0.20 $0.25 $0.30 $0.35 $0.40 $0.46 $0.51 $1.01<br />

$0.09 $0.14 $0.19 $0.24 $0.28 $0.33 $0.38 $0.42 $0.47 $0.94<br />

$0.09 $0.13 $0.18 $0.22 $0.26 $0.31 $0.35 $0.40 $0.44 $0.88<br />

$0.09 $0.14 $0.19 $0.23 $0.28 $0.33 $0.37 $0.42 $0.47 $0.93<br />

$0.09 $0.13 $0.18 $0.22 $0.26 $0.31 $0.35 $0.40 $0.44 $0.88<br />

$0.08 $0.12 $0.17 $0.21 $0.25 $0.29 $0.33 $0.37 $0.42 $0.83<br />

$0.08 $0.12 $0.16 $0.20 $0.24 $0.28 $0.32 $0.36 $0.40 $0.79<br />

$0.09 $0.14 $0.18 $0.23 $0.27 $0.32 $0.36 $0.41 $0.45 $0.91<br />

$0.09 $0.13 $0.17 $0.22 $0.26 $0.30 $0.35 $0.39 $0.43 $0.86<br />

$0.08 $0.12 $0.17 $0.21 $0.25 $0.29 $0.33 $0.37 $0.41 $0.83<br />

$0.08 $0.12 $0.16 $0.20 $0.24 $0.28 $0.32 $0.36 $0.40 $0.79<br />

$0.08 $0.11 $0.15 $0.19 $0.23 $0.27 $0.30 $0.34 $0.38 $0.76<br />

$0.07 $0.11 $0.15 $0.18 $0.22 $0.26 $0.29 $0.33 $0.37 $0.73<br />

$0.07 $0.11 $0.14 $0.18 $0.21 $0.25 $0.28 $0.32 $0.35 $0.70<br />

$0.07 $0.10 $0.14 $0.17 $0.20 $0.24 $0.27 $0.31 $0.34 $0.68<br />

$0.07 $0.11 $0.15 $0.18 $0.22 $0.26 $0.30 $0.33 $0.37 $0.74<br />

$0.07 $0.10 $0.14 $0.17 $0.21 $0.24 $0.28 $0.31 $0.35 $0.70<br />

$0.07 $0.10 $0.13 $0.16 $0.20 $0.23 $0.26 $0.30 $0.33 $0.66<br />

$0.06 $0.09 $0.12 $0.16 $0.19 $0.22 $0.25 $0.28 $0.31 $0.62<br />

$0.06 $0.09 $0.12 $0.15 $0.18 $0.21 $0.24 $0.27 $0.30 $0.59<br />

$0.06 $0.08 $0.11 $0.14 $0.17 $0.20 $0.23 $0.25 $0.28 $0.56<br />

$0.05 $0.08 $0.11 $0.13 $0.16 $0.19 $0.22 $0.24 $0.27 $0.54<br />

$0.06 $0.09 $0.12 $0.15 $0.18 $0.21 $0.24 $0.27 $0.30 $0.61<br />

$0.06 $0.09 $0.12 $0.15 $0.17 $0.20 $0.23 $0.26 $0.29 $0.58<br />

$0.06 $0.08 $0.11 $0.14 $0.17 $0.20 $0.22 $0.25 $0.28 $0.56<br />

$0.05 $0.08 $0.11 $0.13 $0.16 $0.19 $0.22 $0.24 $0.27 $0.54<br />

$0.05 $0.08 $0.10 $0.13 $0.16 $0.18 $0.21 $0.23 $0.26 $0.52<br />

$0.05 $0.08 $0.10 $0.13 $0.15 $0.18 $0.20 $0.23 $0.25 $0.50<br />

$0.05 $0.07 $0.10 $0.12 $0.15 $0.17 $0.19 $0.22 $0.24 $0.48<br />

$0.05 $0.07 $0.09 $0.12 $0.14 $0.16 $0.19 $0.21 $0.23 $0.47<br />

$0.05 $0.07 $0.09 $0.12 $0.14 $0.16 $0.18 $0.21 $0.23 $0.46<br />

$0.05 $0.07 $0.09 $0.11 $0.14 $0.16 $0.18 $0.20 $0.23 $0.45<br />

$0.05 $0.08 $0.10 $0.13 $0.16 $0.18 $0.21 $0.24 $0.26 $0.52<br />

Pipe Capital Costs_Single_PF of 3_FINAL.xls, Capital Costs Page 5 of 6 3/30/2007 2:55 PM