APPENDIX ‘A’ – California Department of Health Services Requirements for Demonstration of Reduction of Virus and Bacteria by Filtration and Disinfection ‘B’ – Memorandum concerning cleaning of UV quartz sleeves 4
Appendix B TECHNICAL MEMORANDUM Reclaimed Water Transmission Main Capital Cost and Pumping Cost Analysis
- Page 380 and 381: TM3: Recycled Wastewater System Com
- Page 382: o Synthetic medium o Two-stage Surf
- Page 385 and 386: TM3: Recycled Wastewater System Com
- Page 387 and 388: TM3: Recycled Wastewater System Com
- Page 389 and 390: TM3: Recycled Wastewater System Com
- Page 391 and 392: TM3: Recycled Wastewater System Com
- Page 393 and 394: TM3: Recycled Wastewater System Com
- Page 395 and 396: TM3: Recycled Wastewater System Com
- Page 397 and 398: TM3: Recycled Wastewater System Com
- Page 399 and 400: TM3: Recycled Wastewater System Com
- Page 401 and 402: TM3: Recycled Wastewater System Com
- Page 403 and 404: Table 13 WATER REUSE SYSTEM COST OF
- Page 405 and 406: TM3: Recycled Wastewater System Com
- Page 407 and 408: TM3: Recycled Wastewater System Com
- Page 409 and 410: Cost of Service, $/1000 gallon 1.00
- Page 411 and 412: TM3: Recycled Wastewater System Com
- Page 413 and 414: TM3: Recycled Wastewater System Com
- Page 415 and 416: TM3: Recycled Wastewater System Com
- Page 417 and 418: TM3: Recycled Wastewater System Com
- Page 419 and 420: Cost of Service, $/1000 gallons 8.0
- Page 421 and 422: TM3: Recycled Wastewater System Com
- Page 423 and 424: Appendix A Water Reuse Regulatory E
- Page 425 and 426: Table A-1. 2000 California Water Re
- Page 427 and 428: California Department of Health Ser
- Page 429: Other Media Type Filters Fuzzy Filt
- Page 433 and 434: Appendix B Reclaimed Water Transmis
- Page 435 and 436: Exhibit 1 Transmission Main Cost To
- Page 437 and 438: Pipe Installation Data (DR 18 PVC P
- Page 439 and 440: Equipment Costs (with O&P) Item Des
- Page 441 and 442: Water Reuse Pipe Line Construction
- Page 443 and 444: Construction Unit Costs Item (2006
- Page 445 and 446: Crew Costs (with O&P) St. Paul Pres
- Page 447 and 448: Capital PROJECT Cost Curves for Rec
- Page 449 and 450: Diam (in) Annual Average Day Flow A
- Page 451 and 452: Diam (in) Annual Average Day Flow A
- Page 453 and 454: Pipe Capital Project Cost, $ Millio
- Page 455 and 456: Pipe Capital Project Cost, $/1000 g
- Page 457 and 458: Capital PROJECT Cost Curves for Rec
- Page 459 and 460: Capital PROJECT Cost Curves for Rec
- Page 461 and 462: Annual Pipe Average Annual Velocity
- Page 463 and 464: Pipe Capital Project Cost, $ Millio
- Page 465 and 466: Exhibit 3 Water Reuse System O&M Co
- Page 467 and 468: Diam (in) Annual Average Day Flow (
- Page 469 and 470: Diam (in) Annual Average Day Flow (
- Page 471 and 472: Diam (in) Annual Average Day Flow (
- Page 473 and 474: Diam (in) Annual Average Day Flow (
- Page 475 and 476: Pumping Cost, $/1000 gallons 0.095
- Page 477 and 478: Water Reuse System Estimated Cost o
- Page 479 and 480: WATER REUSE SYSTEM COST OF SERVICE
APPENDIX<br />
‘A’ – Cali<strong>for</strong>nia Department of Health Services<br />
Requirements <strong>for</strong> Demonstration of Reduction of Virus<br />
and Bacteria by Filtration and Disinfection<br />
‘B’ – Memorandum concerning cleaning of UV quartz sleeves<br />
4