Recycling Treated Municipal Wastewater for Industrial Water Use
Recycling Treated Municipal Wastewater for Industrial Water Use Recycling Treated Municipal Wastewater for Industrial Water Use
TM3: Recycled Wastewater System Components and Costs Recycling Treated Municipal Wastewater for Industrial Water Use Page left intentionally blank 44 Craddock Consulting Engineers In Association with CDM & James Crook TM3-Component&Costs_0707
Appendix A Water Reuse Regulatory Exhibits
- Page 372 and 373: TM3: Recycled Wastewater System Com
- Page 374 and 375: WWTP 1 - 2 - 3 - 4 - 5 - 1 Treatmen
- Page 376 and 377: TM3: Recycled Wastewater System Com
- Page 378 and 379: TM3: Recycled Wastewater System Com
- Page 380 and 381: TM3: Recycled Wastewater System Com
- Page 382: o Synthetic medium o Two-stage Surf
- Page 385 and 386: TM3: Recycled Wastewater System Com
- Page 387 and 388: TM3: Recycled Wastewater System Com
- Page 389 and 390: TM3: Recycled Wastewater System Com
- Page 391 and 392: TM3: Recycled Wastewater System Com
- Page 393 and 394: TM3: Recycled Wastewater System Com
- Page 395 and 396: TM3: Recycled Wastewater System Com
- Page 397 and 398: TM3: Recycled Wastewater System Com
- Page 399 and 400: TM3: Recycled Wastewater System Com
- Page 401 and 402: TM3: Recycled Wastewater System Com
- Page 403 and 404: Table 13 WATER REUSE SYSTEM COST OF
- Page 405 and 406: TM3: Recycled Wastewater System Com
- Page 407 and 408: TM3: Recycled Wastewater System Com
- Page 409 and 410: Cost of Service, $/1000 gallon 1.00
- Page 411 and 412: TM3: Recycled Wastewater System Com
- Page 413 and 414: TM3: Recycled Wastewater System Com
- Page 415 and 416: TM3: Recycled Wastewater System Com
- Page 417 and 418: TM3: Recycled Wastewater System Com
- Page 419 and 420: Cost of Service, $/1000 gallons 8.0
- Page 421: TM3: Recycled Wastewater System Com
- Page 425 and 426: Table A-1. 2000 California Water Re
- Page 427 and 428: California Department of Health Ser
- Page 429 and 430: Other Media Type Filters Fuzzy Filt
- Page 431 and 432: Appendix B TECHNICAL MEMORANDUM Rec
- Page 433 and 434: Appendix B Reclaimed Water Transmis
- Page 435 and 436: Exhibit 1 Transmission Main Cost To
- Page 437 and 438: Pipe Installation Data (DR 18 PVC P
- Page 439 and 440: Equipment Costs (with O&P) Item Des
- Page 441 and 442: Water Reuse Pipe Line Construction
- Page 443 and 444: Construction Unit Costs Item (2006
- Page 445 and 446: Crew Costs (with O&P) St. Paul Pres
- Page 447 and 448: Capital PROJECT Cost Curves for Rec
- Page 449 and 450: Diam (in) Annual Average Day Flow A
- Page 451 and 452: Diam (in) Annual Average Day Flow A
- Page 453 and 454: Pipe Capital Project Cost, $ Millio
- Page 455 and 456: Pipe Capital Project Cost, $/1000 g
- Page 457 and 458: Capital PROJECT Cost Curves for Rec
- Page 459 and 460: Capital PROJECT Cost Curves for Rec
- Page 461 and 462: Annual Pipe Average Annual Velocity
- Page 463 and 464: Pipe Capital Project Cost, $ Millio
- Page 465 and 466: Exhibit 3 Water Reuse System O&M Co
- Page 467 and 468: Diam (in) Annual Average Day Flow (
- Page 469 and 470: Diam (in) Annual Average Day Flow (
- Page 471 and 472: Diam (in) Annual Average Day Flow (
Appendix A<br />
<strong>Water</strong> Reuse Regulatory Exhibits