TM3: Recycled <strong>Wastewater</strong> System Components and Costs<br />

<strong>Recycling</strong> <strong>Treated</strong> <strong>Municipal</strong> <strong>Wastewater</strong> <strong>for</strong> <strong>Industrial</strong> <strong>Water</strong> <strong>Use</strong><br />

Table 16. Unit Construction and Project Costs <strong>for</strong> Force Mains 1<br />

Unit Construction Cost , $/lf Unit Project Cost 2, $/lf<br />

Diameter Urban Rural Urban Rural<br />

(inches) Area Area Area Area<br />

4 54 44 97 79<br />

6 59 48 106 86<br />

8 64 53 115 95<br />

10 71 60 128 108<br />

12 78 66 140 119<br />

14 87 76 157 137<br />

16 105 93 189 167<br />

18 117 105 211 189<br />

20 131 119 236 214<br />

24 158 146 284 263<br />

30 196 180 353 324<br />

36 241 224 434 403<br />

42 295 277 531 499<br />

48 373 353 671 635<br />

54 434 413 781 743<br />

60 495 470 891 846<br />

1 Based on the following:<br />

-Sept. 2006 dollars, ENR CCI = 7763<br />

-Mean Indices, 2006 and Cost Tool with detailed unit costs (App. B, Exhibit 1)<br />

-Average depth of installation <strong>for</strong> <strong>for</strong>ce mains assumed to be 8 ft.<br />

-4 to 24” pipe is PVC; >24” is DIP<br />

2 Project unit costs based on master planning level assumptions: 50% <strong>for</strong> undeveloped<br />

design detail (includes allowance <strong>for</strong> related appurtenances).<br />

Operation and Maintenance Costs<br />

Transmission system operations costs characterized <strong>for</strong> this cost model include<br />

electrical power costs and a unit cost per mile <strong>for</strong> equipment and labor to maintain the<br />

distribution system. The total dynamic head was calculated <strong>for</strong> a range of flows and<br />

pipe lengths to estimate the pumping costs. Regression analysis was used to provide<br />

the relationship of power costs to flow at various pipe lengths. Appendix B<br />

documents this analysis.<br />

The cost to maintain the transmission pipe system is based on the length of the pipe.<br />

The unit cost selected, $5,500 per mile per year, is based on WWTP records <strong>for</strong><br />

maintenance of reclaimed water transmission system <strong>for</strong> Cary, North Carolina,<br />

escalated <strong>for</strong> larger flows (CDM, 2004). It also compares reasonably to literature<br />

references (Gumerman et al, 1992)<br />

Craddock Consulting Engineers 33<br />

In Association with CDM & James Crook<br />

TM3-Component&Costs_0707

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!