Table 13<br />

WATER REUSE SYSTEM COST OF SERVICE ASSUMPTIONS AND SUMMARY RESULTS<br />

Blue = Values to input<br />

Capital Cost and Debt Financing Assumptions<br />

Summary of Capital Cost Estimates<br />

Total Capital Cost $1,412,830 Description Total Cost<br />

Amount of Grant Funding $0 Treatment Facilities $180,000<br />

<strong>Municipal</strong> % of Up-Front Capital 100% Storage Facilities $0<br />

Other % of Up-Front Capital 0% Pump Station $485,630<br />

Debt Term (Years) 20 Piping $747,200<br />

Annual Interest Rate 5.00% TOTAL CAPITAL $1,412,830<br />

Issuance Costs, % of Capital 1%<br />

Annual Avg Flow/Demand (MGD) 1.0<br />

Operation and Maintenance Cost Items<br />

Lab, Chemicals & Power Maintenance<br />

Length of Distribution System (mi) 1.0 Lab Costs, $ $20,000 Pump System Labor, hrs/wk 4<br />

Sodium Hypochlorite, $/gal of 12.5% $0.70 Pump System Equip, % capital 1%<br />

Chlorine Dose, mg/L (year-round, see Note A) 7 Treatment Facilities, % capital 5%<br />

Electrical Power, $/kwhr $0.045 Distribution System, $/mile $5,500<br />

FTE Annual Salary with Benefits, $<br />

Finance, Operations, Cust Service $80,000<br />

Legal $150,000<br />

Engineering $100,000<br />

Estimated Total Type of Cost: Estimated Cost<br />

Cost Components Basis/Methodology Cost in Year 1 Fixed or per<br />

(2007) Variable? 1,000 Gallons<br />

CAPITAL Debt Service (Capital Cost) Based on debt service payment $109,050 Fixed $0.30<br />

Pumping System<br />

Maintenance Labor hours/week at operator rate input-see Note B $8,800 Combination $0.02<br />

Equipment Maintenance Based on % of capital cost input $4,856 Combination $0.01<br />

OPERATION Electrical Power Based on per Kwh rate input; see Note C $14,736 Variable $0.04<br />

AND Reuse Treatment at WWTP<br />

MAINTENANCE Chlorine Disinfection $/gallon at %Conc input; see Note A $14,342 Variable $0.04<br />

Other Chemicals/Misc From Treatment Module $0 Variable $0.00<br />

Laboratory Lab cost input $20,000 Fixed $0.05<br />

Electrical Power From Treatment Module $0 Variable $0.00<br />

Equipment Maintenance Based on % of capital cost input $9,000 Combination $0.02<br />

Distribution System Maintenance Equals water system cost/mile-see Note B $5,500 Combination $0.02<br />

General System Management<br />

GENERAL Engineering 0.15 FTE base; .05% increase per mgd >1 $15,000 Combination $0.04<br />

AND Finance and Accounting 0.15 FTE $12,000 Combination $0.03<br />

ADMINISTRATIVE Legal 0.05 FTE $7,500 Combination $0.02<br />

Customer Service 0.05 FTE $4,000 Combination $0.01<br />

TOTAL OF ALL COST COMPONENTS FOR SYSTEM: $0.62<br />

NOTES:<br />

A - based on a dose of 6.0 mg/l <strong>for</strong> additional disinfection and residual disinfection during Apr-Oct when MN WWTPs disinfect and 9 mg/l <strong>for</strong> Nov-Apr to provide main disinfection and residual <strong>for</strong> transmission.<br />

B - escalates 10% <strong>for</strong> flows from 1-10 mgd and 30% <strong>for</strong> flows greater than 10 mgd.<br />

C - costs based on cost curves developed and included in separate worksheet<br />

In addition to the reclaimed water costs, customers will incur internal costs <strong>for</strong> installation, operation, and maintenance of point-of-use treatment systems needed to use the<br />

reclaimed water <strong>for</strong> the facilities specific needs.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!