Schedule:<br />

Environmental Document Approval Date: Need Unknown<br />

Municipal Consent Approval Date: Need Unknown<br />

Geometric Layout Approval Date: Need Unknown<br />

Construction Limits Established Date: Need Unknown<br />

Original Letting Date: 2018<br />

Current Letting Date: 2018<br />

Construction Season: 2018<br />

Estimated Substantial Completion:<br />

Project History:<br />

Bridge 27871 was built in 1967 and had a low<br />

slump concrete wear surface installed in 1995.<br />

This bridge is structurally deficient, has a<br />

sufficiency rating of 44.1, and has NBIS condition<br />

ratings of 5 for the deck, 5 for the superstructure,<br />

and 4 for the<br />

Project Benefits:<br />

Reduces weave for southbound I-35W traffic<br />

destined for future potential Lake Street exit<br />

Project Risks:<br />

May require replacement of Bridge 27868 (Ped @<br />

24" Street over I 35W, TH 65) to accommodate<br />

new bridge profile, requires realignment of TH 65<br />

southbound<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

I 35W<br />

I 35 South Bound over Highway 65 North Bound<br />

Bridge 27871, 27868<br />

<strong>State</strong> Project No. 2782-278<br />

Project Description:<br />

Replace Bridge 27871 (I 35W southbound<br />

over Hwy. 65 northbound) and Bridge 27868<br />

(24th Street Pedestrian over I 35W and Hwy.<br />

65). Adjust horizontal and vertical alignment<br />

of I 35W southbound, and adjust horizontal<br />

alignment of Hwy. 65 southbound.<br />

40<br />

Hennepin<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Construction Letting:<br />

Other Construction Elements:<br />

Engineering:<br />

Right of Way:<br />

Recent Changes and Updates:<br />

43<br />

22<br />

Minneapolis<br />

35<br />

33<br />

23<br />

52<br />

MISSISSIPPI R<br />

Project not fully scoped. Project will be reviewed as part of the I-35W Transit / Access<br />

Study beginning in early 2010<br />

Key Cost Estimate Assumptions:<br />

Baseline Est. Current Est.<br />

52.9<br />

0.0<br />

8.1<br />

0.0<br />

Total: $ 61.0<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Assumes replacement of Bridge 27871 and 27868, assumes realignment of TH 65<br />

southbound to left of I 35W southbound<br />

$<br />

$<br />

$<br />

$<br />

<strong>Minnesota</strong> Department of Transportation<br />

District M<br />

1500 West County Road B2<br />

(651) 234-7500<br />

District Engineer: Scott McBride<br />

Project Manager: Scott Pedersen<br />

Original date of Posting: January-09<br />

Revised Date:<br />

152<br />

5<br />

122<br />

36<br />

48<br />

3<br />

Page H7