Schedule: Environmental Document Approval Date: Pending Approval Municipal Consent Approval Date: Geometric Layout Approval Date: Construction Limits Established Date: Original Letting Date: 6/12/2015 Current Letting Date: 3/25/2011 Construction Season: 2011/2012 Estimated Substantial Completion: Project History: Project Benefits: Project provides 20-year pavement, corrected drainage, and safety improvements. Project Risks: PROJECT SUMMARY I-35E From south of Ramsey Co CSAH 96 to north junction I-35W State Project No. 0282-34, /, 6281-23 Annual Report on Major Highway Projects Minnesota Department of Transportation Project Description: Unbonded concrete overlay on I-35E from south of Ramsey Co CSAH 96 to the north junction of I-35W, drainage corrections, cable median guardrail. Total Project Cost Estimate (millions) Date in which the project entered into the STIP: Baseline Est. Current Est. Construction Letting: $ 18.3 $ 21.2 Other Construction Elements: $ 0.0 $ 0.0 Engineering: $ 4.1 $ 4.2 Right of Way: $ 0.0 $ 0.0 Total: $ 22.4 $ 25.4 Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by OCPPM. Recent Changes and Updates: Key Cost Estimate Assumptions: Minnesota Department of Transportation District M 1500 West County Road B2 (651)234-7500 District Engineer: Scott McBride Project Manager: Jennie Read Original date of Posting: Revised Date: 1/15/2011 Page H2
Cayuga Bridge between University Avenue and Maryland Avenue including the Maryland Ave Bridge (Cayuga) Bridge 6515, 9265, 6517, 6513 State Project No. 6280-308 http://www.dot.state.mn.us/projects/cayuga Schedule: Environmental Document Approval Date: Pending Approval Municipal Consent Approval Date: Pending Approval Geometric Layout Approval Date: Pending Approval Construction Limits Established Date: Pending Approval Original Letting Date: 4/25/2014 Current Letting Date: 11/16/2012 Construction Season: 2012-2015 Estimated Substantial Completion: 2015 Project History: Cayuga Bridge: Built in 1965, bridge repair and paint in 1975, "limited service" overlay in 2004, inspection in 2008, NBI deck: 5, super: 4, sub: 4, sufficiency rating: 40.8. Need to replace bridge by 2018 per Chapter 152 requirements. Project Benefits: Bridge replacement, geometric improvements for safety and operation, added capacity Project Risks: High potential for environmental contamination, poor soils Annual Report on Major Highway Projects Minnesota Department of Transportation PROJECT SUMMARY I 35E Project Description: Cayuga Bridge (6515) replacement, Pennsylvania Ave. Bridge (9265) replacement, BNSF RR Bridge (6517) replacement, replace Pennsylvania interchange with interchange at Cayuga to solve safety and operational problems, geometric improvements on 35E, reconstruction of 35E, lane addition on 35E Total Project Cost Estimate (millions) Date in which the project entered into the STIP: Recent Changes and Updates: Maryland Ave. Bridge project (SP 6280-353) to be tied to this project Key Cost Estimate Assumptions: 33 34 55 35E Ramsey Baseline Est. Current Est. Construction Letting: $ 143.9 $ 131.5 Other Construction Elements: $ 5.3 $ 14.4 Engineering: $ 24.4 $ 25.0 Right of Way: $ 11.3 $ 18.7 Total: $ 195.7 $ 189.6 Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by OCPPM. Risk added for roadway construction i.e. soils, water resources, pavement design, risk added for environmental cleanup and oversight, RR agreement - $4,926,980 estimate, utility relocation - $3,000,000 Minnesota Department of Transportation District M 1500 West County Road B2 (651) 234-7500 District Engineer: Scott McBride Project Manager: Joey Lundquist Original date of Posting: Jan 2009 Revised Date: 1/15/2011 94 31 6513 Saint Paul 58 Page H3
- Page 39 and 40: PROJECT SUMMARY Hwy. 71 3.0 miles s
- Page 41 and 42: Perham ?gA@ ?¬A@ )i ?aA@ ! ! ?ýA@
- Page 43 and 44: Schedule: Environmental Document Ap
- Page 45 and 46: Schedule: Environmental Document Ap
- Page 47 and 48: Schedule: Environmental Document Ap
- Page 49: Schedule: Environmental Document Ap
- Page 52 and 53: Schedule: Environmental Document Ap
- Page 54 and 55: PROJECT SUMMARY Hwy. 59 North of TH
- Page 56 and 57: Schedule: Environmental Document Ap
- Page 58 and 59: District Project Summary District 6
- Page 60 and 61: Schedule: Environmental Document Ap
- Page 62 and 63: Schedule: Elk Run interchange State
- Page 64 and 65: Schedule: Environmental Document Ap
- Page 66 and 67: Schedule: Environmental Document Ap
- Page 68 and 69: From 2.2 Miles east of Hwy. 74 to w
- Page 70 and 71: ?«A@ ?ÁA@ )x ?ÀA@ )x Pipestone ?
- Page 72 and 73: Schedule: PROJECT SUMMARY Hwy. 14 B
- Page 74 and 75: Schedule: Environmental Document Ap
- Page 76 and 77: Schedule: Environmental Document Ap
- Page 78 and 79: Schedule: Environmental Document Ap
- Page 80 and 81: Schedule: Environmental Document Ap
- Page 82 and 83: Schedule: Environmental Document Ap
- Page 84 and 85: District Project Summary District 8
- Page 86 and 87: Schedule: Environmental Document Ap
- Page 88 and 89: ! ! %&h( %&h( !"b$ %&d( %&f( %&c( %
- Page 92 and 93: Schedule: Environmental Document Ap
- Page 94 and 95: Schedule: Environmental Document Ap
- Page 96 and 97: Schedule: Environmental Document Ap
- Page 98 and 99: Schedule: Environmental Document Ap
- Page 100 and 101: Schedule: Environmental Document Ap
- Page 102 and 103: Schedule: Environmental Document Ap
- Page 104 and 105: Schedule: Environmental Document Ap
- Page 106 and 107: Schedule: Environmental Document Ap
- Page 108 and 109: New alignment Hwy. 169 to Hennepin
- Page 110 and 111: Schedule: Environmental Document Ap
Schedule:<br />
Environmental Document Approval Date: Pending Approval<br />
Municipal Consent Approval Date:<br />
Geometric Layout Approval Date:<br />
Construction Limits Established Date:<br />
Original Letting Date: 6/12/2015<br />
Current Letting Date: 3/25/2011<br />
Construction Season: 2011/2012<br />
Estimated Substantial Completion:<br />
Project History:<br />
Project Benefits:<br />
Project provides 20-year pavement, corrected<br />
drainage, and safety improvements.<br />
Project Risks:<br />
PROJECT SUMMARY<br />
I-35E<br />
From south of Ramsey Co CSAH 96 to north junction I-35W<br />
<strong>State</strong> Project No. 0282-34, /, 6281-23<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
Project Description:<br />
Unbonded concrete overlay on I-35E from<br />
south of Ramsey Co CSAH 96 to the north<br />
junction of I-35W, drainage corrections,<br />
cable median guardrail.<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 18.3<br />
$ 21.2<br />
Other Construction Elements: $ 0.0<br />
$ 0.0<br />
Engineering: $ 4.1<br />
$ 4.2<br />
Right of Way: $ 0.0<br />
$ 0.0<br />
Total: $ 22.4 $ 25.4<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Recent Changes and Updates:<br />
Key Cost Estimate Assumptions:<br />
<strong>Minnesota</strong> Department of Transportation<br />
District M<br />
1500 West County Road B2<br />
(651)234-7500<br />
District Engineer: Scott McBride<br />
Project Manager: Jennie Read<br />
Original date of Posting:<br />
Revised Date: 1/15/2011<br />
Page H2