Schedule: Environmental Document Approval Date: 01/07/2009 Municipal Consent Approval Date: Not Needed Geometric Layout Approval Date: Not Needed Construction Limits Established Date: Not Needed Original Letting Date: 11/21/2014 Current Letting Date: 10/23/2009 Construction Season: 2010 Estimated Substantial Completion: 11/01/2010 Project History: The need for this project is a deteriorated pavement, indicated by the deteriorating pavement structure of the full depth bituminous pavement causing reduced ability to support heavy loads, rough ride, and overwhelming maintenance costs. The purpose of this project is to regain the pavement strength, improve the ride, and reduce maintenance costs. Project Benefits: Provides long term pavement serviceability for failing full depth bituminous pavement Project Risks: PROJECT SUMMARY Hwy. 23 Russell to Marshall, including all 2 and 4 lane sections. State Project No. 4203-46 SUBSTANTIALLY COMPLETE Annual Report on Major Highway Projects Minnesota Department of Transportation Project Description: Mill and concrete overlay Total Project Cost Estimate (millions) Date in which the project entered into the STIP: Baseline Est. Current Est. Construction Letting: $ 21.9 $ 16.7 Other Construction Elements: $ 1.4 $ 1.4 Engineering: $ 4.7 $ 3.6 Right of Way: $ 0.0 $ 0.0 This project now includes the work formerly found under (retired) S.P. number 4203-51. Letting was 10-23-09 31 4 83 5 59 20 76 25 30 Total: $ 28.0 $ 21.7 Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by OCPPM. Recent Changes and Updates: Key Cost Estimate Assumptions: 5 74 Lynd Lyon Minnesota Department of Transportation District 8 2505 Transportation Road (320) 231-5195 District Engineer: Jon Huseby Project Manager: Dena Knutson Original date of Posting: Jan 2009 Revised Date: 1/15/2011 63 7 33 2 77 67 72 35 67 67 67 Marshall 6 35 81 62 Page G3
Schedule: Environmental Document Approval Date: Pending Approval Municipal Consent Approval Date: Not Needed Geometric Layout Approval Date: Not Needed Construction Limits Established Date: Not Needed Original Letting Date: 11/20/2015 Current Letting Date: 11/18/2016 Construction Season: 2017 Estimated Substantial Completion: 11/01/2017 Project History: The need for this project is a deteriorated pavement, indicated by the deteriorating pavement structure of the full depth bituminous pavement causing reduced ability to support heavy loads, rough ride, and overwhelming maintenance costs. The purpose of this project is to regain the pavement strength, improve the ride, and reduce maintenance costs. Project Benefits: Provides long term pavement serviceability for failing full depth bituminous pavement Project Risks: Annual Report on Major Highway Projects Minnesota Department of Transportation PROJECT SUMMARY Hwy. 23 Cottonwood to Granite Falls State Project No. 4203-50 Project Description: Mill and concrete overlay Total Project Cost Estimate (millions) Date in which the project entered into the STIP: Construction Letting: Other Construction Elements: Engineering: Right of Way: Recent Changes and Updates: ?âA@ ?¼A@ Cottonwood !( Hanley Falls !( ?ÎA@ Granite Falls !( Wood Lake !( This project now includes the work formerly found under (retired) S.P. number 8701-36. Key Cost Estimate Assumptions: Baseline Est. Current Est. 23.1 1.9 5.0 0.0 Total: $ 30.0 - $ $ $ $ $ - $ - $ - $ - $ 31.3 2.5 6.8 0.0 40.6 Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by OCPPM. Minnesota Department of Transportation District 8 2505 Transportation Road (320) 231-5195 District Engineer: Jon Huseby Project Manager: Susan Karnowski Original date of Posting: Jan 2009 Revised Date: 1/15/2011 ¹ Page G4
- Page 35 and 36: Schedule: Environmental Document Ap
- Page 37 and 38: Schedule: Environmental Document Ap
- Page 39 and 40: PROJECT SUMMARY Hwy. 71 3.0 miles s
- Page 41 and 42: Perham ?gA@ ?¬A@ )i ?aA@ ! ! ?ýA@
- Page 43 and 44: Schedule: Environmental Document Ap
- Page 45 and 46: Schedule: Environmental Document Ap
- Page 47 and 48: Schedule: Environmental Document Ap
- Page 49: Schedule: Environmental Document Ap
- Page 52 and 53: Schedule: Environmental Document Ap
- Page 54 and 55: PROJECT SUMMARY Hwy. 59 North of TH
- Page 56 and 57: Schedule: Environmental Document Ap
- Page 58 and 59: District Project Summary District 6
- Page 60 and 61: Schedule: Environmental Document Ap
- Page 62 and 63: Schedule: Elk Run interchange State
- Page 64 and 65: Schedule: Environmental Document Ap
- Page 66 and 67: Schedule: Environmental Document Ap
- Page 68 and 69: From 2.2 Miles east of Hwy. 74 to w
- Page 70 and 71: ?«A@ ?ÁA@ )x ?ÀA@ )x Pipestone ?
- Page 72 and 73: Schedule: PROJECT SUMMARY Hwy. 14 B
- Page 74 and 75: Schedule: Environmental Document Ap
- Page 76 and 77: Schedule: Environmental Document Ap
- Page 78 and 79: Schedule: Environmental Document Ap
- Page 80 and 81: Schedule: Environmental Document Ap
- Page 82 and 83: Schedule: Environmental Document Ap
- Page 84 and 85: District Project Summary District 8
- Page 88 and 89: ! ! %&h( %&h( !"b$ %&d( %&f( %&c( %
- Page 90 and 91: Schedule: Environmental Document Ap
- Page 92 and 93: Schedule: Environmental Document Ap
- Page 94 and 95: Schedule: Environmental Document Ap
- Page 96 and 97: Schedule: Environmental Document Ap
- Page 98 and 99: Schedule: Environmental Document Ap
- Page 100 and 101: Schedule: Environmental Document Ap
- Page 102 and 103: Schedule: Environmental Document Ap
- Page 104 and 105: Schedule: Environmental Document Ap
- Page 106 and 107: Schedule: Environmental Document Ap
- Page 108 and 109: New alignment Hwy. 169 to Hennepin
- Page 110 and 111: Schedule: Environmental Document Ap
Schedule:<br />
Environmental Document Approval Date: 01/07/2009<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Not Needed<br />
Construction Limits Established Date: Not Needed<br />
Original Letting Date: 11/21/2014<br />
Current Letting Date: 10/23/2009<br />
Construction Season: 2010<br />
Estimated Substantial Completion: 11/01/2010<br />
Project History:<br />
The need for this project is a deteriorated<br />
pavement, indicated by the deteriorating pavement<br />
structure of the full depth bituminous pavement<br />
causing reduced ability to support heavy loads,<br />
rough ride, and overwhelming maintenance costs.<br />
The purpose of this project is to regain the<br />
pavement strength, improve the ride, and reduce<br />
maintenance costs.<br />
Project Benefits:<br />
Provides long term pavement serviceability for<br />
failing full depth bituminous pavement<br />
Project Risks:<br />
PROJECT SUMMARY<br />
Hwy. 23<br />
Russell to Marshall, including all 2 and 4 lane sections.<br />
<strong>State</strong> Project No. 4203-46<br />
SUBSTANTIALLY COMPLETE<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
Project Description:<br />
Mill and concrete overlay<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 21.9<br />
$ 16.7<br />
Other Construction Elements: $ 1.4<br />
$ 1.4<br />
Engineering: $ 4.7<br />
$ 3.6<br />
Right of Way: $ 0.0<br />
$ 0.0<br />
This project now includes the work formerly found under (retired) S.P. number 4203-51.<br />
Letting was 10-23-09<br />
31<br />
4<br />
83<br />
5<br />
59<br />
20<br />
76<br />
25 30<br />
Total: $ 28.0 $ 21.7<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Recent Changes and Updates:<br />
Key Cost Estimate Assumptions:<br />
5<br />
74<br />
Lynd<br />
Lyon<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 8<br />
2505 Transportation Road<br />
(320) 231-5195<br />
District Engineer: Jon Huseby<br />
Project Manager: Dena Knutson<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
63<br />
7<br />
33<br />
2<br />
77<br />
67<br />
72<br />
35<br />
67<br />
67<br />
67<br />
Marshall<br />
6<br />
35<br />
81<br />
62<br />