RPT - ONE PAGERS - Minnesota State Legislature

RPT - ONE PAGERS - Minnesota State Legislature RPT - ONE PAGERS - Minnesota State Legislature

archive.leg.state.mn.us
from archive.leg.state.mn.us More from this publisher
17.08.2013 Views

District Project Summary District 8 ROUTE PROJECT LOCATION PAGE Hwy. 23 Paynesville bypass G 2 Hwy. 23 Russell to Marshall, including all 2 and 4 lane sections. G 3 Hwy. 23 Cottonwood to Granite Falls G 4 Annual Report on Major Highway Projects Minnesota Department of Transportation Page G1

Schedule: Paynesville bypass State Project No. 3408-15 http://www.dot.state.mn.us/d8/projects/paynesvillebypass/index.html Environmental Document Approval Date: 05/20/2008 Municipal Consent Approval Date: 07/09/2008 Geometric Layout Approval Date: 07/20/2006 Construction Limits Established Date: 11/11/2008 Original Letting Date: 12/23/2005 Current Letting Date: 1/29/2010 Construction Season: Spring 2010 to Summer 2012 Estimated Substantial Completion: 08/01/2012 Project History: The need for this project is regional mobility, highway capacity, deteriorating pavement, and highway safety. The purpose of this project is to provide greater mobility, highway capacity, adequate access to mobility, highway capacity, adequate access to City of Paynesville, greater traffic safety, and reduce or eliminate roadway deficiencies. Project Benefits: Provide greater mobility on the Willmar to St. Cloud corridor, increase highway capacity, improve safety Project Risks: The major risk of potential contaminated soil in former Paynesville City Dump has been greatly mitigated with an alignment shift. Annual Report on Major Highway Projects Minnesota Department of Transportation PROJECT SUMMARY Hwy. 23 Project Description: New construction of 4-lane bypass of Paynesville on new alignment Recent Changes and Updates: Key Cost Estimate Assumptions: 129 15 2 31 2 40 130 98 19 178 106 68 Kandiyohi 103 143 102 6 20 105 39 20 39 130 179 32 25 16 Stearns Total Project Cost Estimate (millions) Date in which the project entered into the STIP: Baseline Est. Current Est. Construction Letting: $ 46.0 $ 44.9 Other Construction Elements: $ 4.0 $ 4.0 Engineering: $ 10.0 $ 10.0 Right of Way: $ 13.0 $ 10.0 Total: $ 73.0 $ 68.9 181 66 33 Meeker Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by OCPPM. Minnesota Department of Transportation District 8 2505 Transportation Road (320) 231-5195 District Engineer: Jon Huseby Project Manager: Lowell Flaten Original date of Posting: Jan 2009 Revised Date: 1/15/2011 10 180 12 68 114 123 34 30 Page G2

District Project Summary<br />

District 8<br />

ROUTE PROJECT LOCATION PAGE<br />

Hwy. 23 Paynesville bypass G 2<br />

Hwy. 23 Russell to Marshall, including all 2 and 4 lane sections. G 3<br />

Hwy. 23 Cottonwood to Granite Falls G 4<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

Page G1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!