Schedule:<br />
Environmental Document Approval Date: 05/01/2004<br />
Municipal Consent Approval Date:<br />
Geometric Layout Approval Date:<br />
Construction Limits Established Date:<br />
Original Letting Date:<br />
Current Letting Date:<br />
Construction Season:<br />
Estimated Substantial Completion:<br />
Project History:<br />
County Road 6 to Lor Ray Drive in North Mankato<br />
<strong>State</strong> Project No. 5203-85<br />
http://www.dot.state.mn.us/d7/projects/14northmankato<br />
Hwy 14 is a principal arterial roadway, which runs<br />
east and west through the City of North Mankato.<br />
It has been classified as a medium-priority<br />
interregional corridor between New Ulm and<br />
Rochester and is on the National Highway<br />
System. 2001 traffic study determined need for<br />
interchange.<br />
Project Benefits:<br />
Improve highway capacity, support for local<br />
development, system continuity, improved access<br />
management<br />
Project Risks:<br />
Constructing a new modified diamond interchange<br />
at Hwy 14/County Hwy 41 creates short spacing<br />
between the County Hwy 41 and Lookout Drive<br />
ramps. Roundabouts vs. signals<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 14<br />
Project Description:<br />
Reconstruction and expansion from twolanes<br />
to four-lanes, approximately 2.7 miles,<br />
construction of a new interchange at Hwy 14<br />
and County Hwy 41, realignment of the Hwy<br />
14 and County Hwy 6 intersection,<br />
roundabouts at the Hwy 14 entrance and exit<br />
ramp intersections with County Hwy 41,<br />
traffic signals<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Construction Letting:<br />
Other Construction Elements:<br />
Engineering:<br />
Right of Way:<br />
Recent Changes and Updates:<br />
City and County acquiring right of way<br />
Key Cost Estimate Assumptions:<br />
117<br />
117<br />
6<br />
120<br />
14<br />
69<br />
41<br />
Nicollet<br />
13<br />
71<br />
33<br />
69 69<br />
Blue Earth<br />
Baseline Est. Current Est.<br />
22.5<br />
2.4<br />
4.5<br />
2.0<br />
Total: $ 31.4<br />
169<br />
North Mankato<br />
Blue Earth<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Minimal risk expected for muck, year to which dollars are inflated, costs to be split with local<br />
units of government<br />
$<br />
$<br />
$<br />
$<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 7<br />
2151 Bassett Drive<br />
(507) 304-6100<br />
District Engineer: James Swanson<br />
Project Manager: Brett Benzkofer<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
16<br />
Page F3