Schedule:<br />

Environmental Document Approval Date: 05/01/2004<br />

Municipal Consent Approval Date:<br />

Geometric Layout Approval Date:<br />

Construction Limits Established Date:<br />

Original Letting Date:<br />

Current Letting Date:<br />

Construction Season:<br />

Estimated Substantial Completion:<br />

Project History:<br />

County Road 6 to Lor Ray Drive in North Mankato<br />

<strong>State</strong> Project No. 5203-85<br />

http://www.dot.state.mn.us/d7/projects/14northmankato<br />

Hwy 14 is a principal arterial roadway, which runs<br />

east and west through the City of North Mankato.<br />

It has been classified as a medium-priority<br />

interregional corridor between New Ulm and<br />

Rochester and is on the National Highway<br />

System. 2001 traffic study determined need for<br />

interchange.<br />

Project Benefits:<br />

Improve highway capacity, support for local<br />

development, system continuity, improved access<br />

management<br />

Project Risks:<br />

Constructing a new modified diamond interchange<br />

at Hwy 14/County Hwy 41 creates short spacing<br />

between the County Hwy 41 and Lookout Drive<br />

ramps. Roundabouts vs. signals<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 14<br />

Project Description:<br />

Reconstruction and expansion from twolanes<br />

to four-lanes, approximately 2.7 miles,<br />

construction of a new interchange at Hwy 14<br />

and County Hwy 41, realignment of the Hwy<br />

14 and County Hwy 6 intersection,<br />

roundabouts at the Hwy 14 entrance and exit<br />

ramp intersections with County Hwy 41,<br />

traffic signals<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Construction Letting:<br />

Other Construction Elements:<br />

Engineering:<br />

Right of Way:<br />

Recent Changes and Updates:<br />

City and County acquiring right of way<br />

Key Cost Estimate Assumptions:<br />

117<br />

117<br />

6<br />

120<br />

14<br />

69<br />

41<br />

Nicollet<br />

13<br />

71<br />

33<br />

69 69<br />

Blue Earth<br />

Baseline Est. Current Est.<br />

22.5<br />

2.4<br />

4.5<br />

2.0<br />

Total: $ 31.4<br />

169<br />

North Mankato<br />

Blue Earth<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Minimal risk expected for muck, year to which dollars are inflated, costs to be split with local<br />

units of government<br />

$<br />

$<br />

$<br />

$<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 7<br />

2151 Bassett Drive<br />

(507) 304-6100<br />

District Engineer: James Swanson<br />

Project Manager: Brett Benzkofer<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

16<br />

Page F3