Schedule:<br />

Environmental Document Approval Date: 1/5/2010<br />

Municipal Consent Approval Date: Not Needed<br />

Geometric Layout Approval Date: Not Needed<br />

Construction Limits Established Date:<br />

Original Letting Date: 01/28/2011<br />

Current Letting Date: 12/17/2010<br />

Construction Season: 2011<br />

Estimated Substantial Completion: Aug-11<br />

Project History:<br />

Interstate 90 concrete surface was constructed in<br />

1971.<br />

Project Benefits:<br />

Improve ride quality, reduce maintenance costs,<br />

replace or repair drainage, replace or repair<br />

appurtenances.<br />

Project Risks:<br />

Traffic will be moved to westbound lanes.<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

I 90<br />

Hwy. 43 to Hwy. 76 (Eastbound Lane)<br />

<strong>State</strong> Project No. 8580-152<br />

SUBSTANTIALLY COMPLETE<br />

Project Description:<br />

Add unbonded concrete overlay to the<br />

existing roadway.<br />

Recent Changes and Updates:<br />

Key Cost Estimate Assumptions:<br />

2<br />

25<br />

20<br />

25<br />

110<br />

23<br />

Stockton<br />

Fillmore<br />

Rushford Village<br />

Rushford<br />

Goodview<br />

12<br />

21<br />

102 4<br />

Traffic is assumed to utilize temporary crossovers during construction.<br />

44<br />

Winona<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 12.1<br />

$ 10.3<br />

Other Construction Elements: $ 0.0<br />

$ 0.0<br />

Engineering: $ 1.0<br />

$ 1.0<br />

Right of Way: $ 0.0<br />

$ 0.0<br />

Total: $ 13.1 $ 11.3<br />

19<br />

32<br />

Winona<br />

105<br />

Houston<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 6<br />

2900 48th Street NW<br />

(507) 286-7500<br />

District Engineer: Nelrae Succio<br />

Project Manager: Jake Rezac<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

17<br />

15<br />

17<br />

15<br />

9<br />

26 13<br />

Page E10<br />