Schedule: Environmental Document Approval Date: Municipal Consent Approval Date: Geometric Layout Approval Date: Construction Limits Established Date: Original Letting Date: Current Letting Date: 1/24/2014 Construction Season: 2014 Estimated Substantial Completion: Fall 2015 Project History: Bridges 74815, 74816, 74817 & 74818 are approximately 45 years old are functionally obsolete and have various structural deficiencies. Bridges 74815 and 74816 span over the DM & E Railroad. Traffic safety issues exist on I-35 for traffic entering from TH 14 West and to Bridge street due to existing geometrics. Project Benefits: Auxiliary lanes and ramps will be built at I-35 and TH 14 West to improve safety. The bridges will be reconstructed as part of the safety. The bridges will be reconstructed as part of the safety improvements. The pavement will be replaced on I- 35 within the Owatonna area and overlayed south and north of Owatonna which will increase the pavement life and increase the ride quality. Project Risks: Municipal consent from the City of Owatonna may be required for bridge replacement and ramp reconstruction. Railroad agreement with DM & E will be required for Bridge replacement. There may be Right of Way needs with potential business impacts. Traffic will be impacted through the City of Owatonna and there will likely be ramp/interchange closures for extended periods of time. Annual Report on Major Highway Projects Minnesota Department of Transportation PROJECT SUMMARY Hwy. 35 Owatonna Vicinity Bridge 74815, 74816,74817, &, 74818 State Project No. 7480-113 Project Description: Construct Auxillary lane on North and South bound I-35 from TH 14 to Bridge street and replace bridges 74815,74816,74817 and 74818. Reconstruct I-35 Pavement NB & SB from 40.787 to 42.608 and Bituminous Mill and overlay NB & SB from 35.906 to 39.999 and from 42.608 to 55.268. New Project )o Total Project Cost Estimate (millions) Date in which the project entered into the STIP: Recent Changes and Updates: Key Cost Estimate Assumptions: ?ÜA@ !( Faribault !"`$ Medford !( §¨` 12/21/2010 Owatonna !( Baseline Est. Current Est. Construction Letting: $ 34.1 $ 34.1 Other Construction Elements: $ 0.0 $ 0.0 Engineering: $ 6.8 $ 5.2 Right of Way: $ 0.5 $ 0.0 Total: $ 41.4 $ 39.8 Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by OCPPM. Traffic will be 2-Lane head to head in Owatonna. The remainder of the project will be completed under traffic. Minnesota Department of Transportation District 6 2900 48th Street NW (507) 286-7500 District Engineer: Nelrae Succio Project Manager: Kjersti Anderson Original date of Posting: Jan, 2010 Revised Date: )o ){ ¹ Page E3

Schedule: Environmental Document Approval Date: Pending Approval Municipal Consent Approval Date: Pending Approval Geometric Layout Approval Date: Pending Approval Construction Limits Established Date: Pending Approval Original Letting Date: 1/24/2014 Current Letting Date: 01/24/2014 Construction Season: 2014 Estimated Substantial Completion: 12/01/2017 Project History: Winona Bridge over Mississippi River Bridge 5900 State Project No. 8503-46 http://www.dot.state.mn.us/d6/projects/winonabridge/ Bridge 5900 was built in 1941 and has a sufficiency rating of 49.8, indicating the need for replacement. Bridge 5900 was recently closed after bridge inspections revealed corrosion issues and a retrofit project was implemented to open the bridge to traffic again. Project Benefits: Bridge 5900 is an important Mississippi River crossing for goods and commodities moving between Minnesota and Wisconsin. Project Risks: The close proximity of this bridge to the downtown business district of the City of Winona will present challenges. Numerous environmental permits are required. There may be contamination issues in the City of Winona within the project area. City of Winona Municipal Consent is required. Annual Report on Major Highway Projects Minnesota Department of Transportation PROJECT SUMMARY Hwy. 43 Project Description: Replace Bridge 5900 129 21 Goodview 12 Winona Total Project Cost Estimate (millions) Date in which the project entered into the STIP: Construction Letting: Other Construction Elements: Engineering: Right of Way: Recent Changes and Updates: Key Cost Estimate Assumptions: 32 44 19 MISSISSIPPI R Winona 105 5900 17 15 12/21/2010 Baseline Est. Current Est. 140.0 0.0 25.2 16.2 Total: $ 181.4 Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by OCPPM. Environmental impacts with bridge and roadway approach work not significant. Contamination issues not cost prohibitive. Municipal Consent from the City of Winona is obtainable. $ $ $ $ Minnesota Department of Transportation District 6 2900 48th Street NW (507) 286-7500 District Engineer: Nelrae Succio Project Manager: Jai Kalsy Original date of Posting: Jan 2009 Revised Date: 1/15/2011 9 9 122 7 Page E4

Schedule:<br />

Environmental Document Approval Date:<br />

Municipal Consent Approval Date:<br />

Geometric Layout Approval Date:<br />

Construction Limits Established Date:<br />

Original Letting Date:<br />

Current Letting Date: 1/24/2014<br />

Construction Season: 2014<br />

Estimated Substantial Completion: Fall 2015<br />

Project History:<br />

Bridges 74815, 74816, 74817 & 74818 are<br />

approximately 45 years old are functionally<br />

obsolete and have various structural deficiencies.<br />

Bridges 74815 and 74816 span over the DM & E<br />

Railroad. Traffic safety issues exist on I-35 for<br />

traffic entering from TH 14 West and to Bridge<br />

street due to existing geometrics.<br />

Project Benefits:<br />

Auxiliary lanes and ramps will be built at I-35 and<br />

TH 14 West to improve safety. The bridges will be<br />

reconstructed as part of the safety. The bridges<br />

will be reconstructed as part of the safety<br />

improvements. The pavement will be replaced on I-<br />

35 within the Owatonna area and overlayed south<br />

and north of Owatonna which will increase the<br />

pavement life and increase the ride quality.<br />

Project Risks:<br />

Municipal consent from the City of Owatonna may<br />

be required for bridge replacement and ramp<br />

reconstruction. Railroad agreement with DM & E<br />

will be required for Bridge replacement. There may<br />

be Right of Way needs with potential business<br />

impacts. Traffic will be impacted through the City<br />

of Owatonna and there will likely be<br />

ramp/interchange closures for extended periods of<br />

time.<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 35<br />

Owatonna Vicinity<br />

Bridge 74815, 74816,74817, &, 74818<br />

<strong>State</strong> Project No. 7480-113<br />

Project Description:<br />

Construct Auxillary lane on North and South<br />

bound I-35 from TH 14 to Bridge street and<br />

replace bridges 74815,74816,74817 and<br />

74818. Reconstruct I-35 Pavement NB & SB<br />

from 40.787 to 42.608 and Bituminous Mill<br />

and overlay NB & SB from 35.906 to 39.999<br />

and from 42.608 to 55.268.<br />

New Project<br />

)o<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Recent Changes and Updates:<br />

Key Cost Estimate Assumptions:<br />

?ÜA@<br />

!( Faribault<br />

!"`$<br />

Medford<br />

!(<br />

§¨`<br />

12/21/2010<br />

Owatonna<br />

!(<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 34.1<br />

$ 34.1<br />

Other Construction Elements: $ 0.0<br />

$ 0.0<br />

Engineering: $ 6.8<br />

$ 5.2<br />

Right of Way: $ 0.5<br />

$ 0.0<br />

Total: $ 41.4 $ 39.8<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Traffic will be 2-Lane head to head in Owatonna. The remainder of the project will be<br />

completed under traffic.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 6<br />

2900 48th Street NW<br />

(507) 286-7500<br />

District Engineer: Nelrae Succio<br />

Project Manager: Kjersti Anderson<br />

Original date of Posting: Jan, 2010<br />

Revised Date:<br />

)o<br />

){<br />

¹<br />

Page E3