Schedule:<br />

Environmental Document Approval Date:<br />

Municipal Consent Approval Date: Not Needed<br />

Geometric Layout Approval Date: Not Needed<br />

Construction Limits Established Date: 12/01/2007<br />

Original Letting Date: 03/23/2007<br />

Current Letting Date: 3/12/2010<br />

Construction Season: May-August 2010<br />

Estimated Substantial Completion: 08/01/2010<br />

Project History:<br />

This portion of I-94 was constructed in 1970. It<br />

has severely cracked and potholes are developing<br />

as the pavement structure continues to deteriorate.<br />

Project Benefits:<br />

New concrete surface will provide long life, less<br />

maintenance, eliminate potholes, and improve<br />

ride. By doing all this, it will also increase safety.<br />

Shoulders will be brought to current design widths.<br />

Project Risks:<br />

Design is not completed. Environmental<br />

regulations for the deck drain piping and concrete<br />

paving may change.<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

I 94<br />

Hwy. 336 to Downer Exit<br />

Bridge 14803<br />

<strong>State</strong> Project No. 1480-142<br />

SUBSTANTIALLY COMPLETE<br />

Project Description:<br />

(1480-142)Unbonded concrete overlay,<br />

replace bituminous shoulders, replace off<br />

and on ramp shoulders, re-deck and new<br />

approach panels for Bridge 14803. 2010<br />

Total Project Cost Estimate (millions)<br />

77<br />

16<br />

Moorhead<br />

8<br />

76<br />

Sabin<br />

Date in which the project entered into the STIP:<br />

Recent Changes and Updates:<br />

Bridge work removed. Cross overs added. Materials design recommendation completed.<br />

Due to the huge increase in bituminous costs on other projects, let earlier, and due to the<br />

spring of 2009 flooding, this project was moved to 2010.<br />

Key Cost Estimate Assumptions:<br />

A project risk factor of 7% was used to calculate the contingency other than the specific risk<br />

listed on the left.<br />

11<br />

63<br />

75<br />

67<br />

12<br />

14<br />

68<br />

4<br />

68<br />

15<br />

17<br />

Clay<br />

52<br />

10<br />

Glyndon<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 12.0<br />

$ 7.5<br />

Other Construction Elements: $ 1.0<br />

$ 0.7<br />

Engineering: $ 3.0<br />

$ 3.0<br />

Right of Way: $ 0.0<br />

$ 0.0<br />

Total: $ 16.0 $ 11.2<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 4<br />

1000 Hwy 10 W<br />

(218) 846-3600<br />

District Engineer: Lee Berget<br />

Project Manager: Jesse Miller<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

117<br />

94<br />

79<br />

69<br />

71<br />

12<br />

62<br />

72<br />

21<br />

Page D5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!