Schedule:<br />

Environmental Document Approval Date: 2010<br />

Municipal Consent Approval Date: Dec-10<br />

Geometric Layout Approval Date: Oct-10<br />

Construction Limits Established Date: Pending Approval<br />

Original Letting Date: 2011/2014<br />

Current Letting Date: 2012<br />

Construction Season: Stage 1 - 2012<br />

Estimated Substantial Completion:<br />

Project History:<br />

Nisswa to Pine River<br />

<strong>State</strong> Project No. 1810-92<br />

http://www.dot.state.mn.us/d3/projects/hwy371/index.html<br />

Final Environmental Impact <strong>State</strong>ment and Record<br />

of Decision were issued in 2005. In 2007, Pequot<br />

Lakes formally reversed its previous decision to<br />

have the new highway utilize the existing highway<br />

corridor and requested Mn/DOT to change<br />

preferred alignment to a bypass of the<br />

community. This caused the need for a<br />

supplement to the completed Environmental<br />

Impact <strong>State</strong>ment. This process was completed in<br />

2010. Funding constraints have caused Mn/DOT<br />

to delay this project several times since initiating<br />

the project in 2002.<br />

Project Benefits:<br />

Improved safety, reduced congestion, correction of<br />

design deficiencies<br />

Project Risks:<br />

Pequot Lakes bypass controversial, supplemental<br />

Environmental Impact <strong>State</strong>ment may be<br />

challenged, budget constraints may continue to<br />

delay project to an undetermined times, turnover<br />

of community leadership may cause significant<br />

changes, continued development along the<br />

existing corridor has the potential to cause<br />

significant changes to the chosen alignment or<br />

increase cost of required R/W<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 371<br />

Project Description:<br />

Expansion of 16 miles of existing two-lane<br />

medium priority Interregional Corridor to a<br />

divided four-lane highway facility. Project<br />

limits include the communities of Nisswa and<br />

Pequot Lakes (Stage 1 & 2) and Jenkins and<br />

Pine River (Stage 3 - not programmed).<br />

Environmental Impact <strong>State</strong>ment level<br />

environmental documentation required as<br />

well as Municipal Consent for each of the<br />

affected communities.<br />

Total Project Cost Estimate (millions)<br />

29<br />

78<br />

114<br />

Cass<br />

17<br />

Lake Shore<br />

Date in which the project entered into the STIP:<br />

Construction Letting:<br />

Other Construction Elements:<br />

Engineering:<br />

Right of Way:<br />

Recent Changes and Updates:<br />

77<br />

Jenkins<br />

145<br />

112<br />

16<br />

Pequot Lakes<br />

168<br />

11<br />

Nisswa<br />

Crow Wing<br />

Layout: Bypass of Pequot Lakes, elimination of grade separated interchanges<br />

It was delayed over the years because of department/district priorities and emphasis on<br />

preservation. A Supplemental Final EIS was completed in 2010. Municipal consent was<br />

granted in Pequot Lakes in Dec 2010. A small project has been scheduled for 2012 in<br />

coordination with realignment of crow wing county Road 18 in Nisswa.<br />

Key Cost Estimate Assumptions:<br />

92.0<br />

18.4<br />

17.7<br />

28.8<br />

107<br />

Baseline Est. Current Est.<br />

Total: $ 156.9<br />

Breezy Point<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Alignment studied in Supplemental Environmental Impact <strong>State</strong>ment will not have significant<br />

changes, 300' R/W corridor, R/W donation and spray irrigation field mitigation by Pequot<br />

Lakes, no interchanges, turnback of existing Hwy. 371 alignment to County Pequot Lakes<br />

$<br />

$<br />

$<br />

$<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 3<br />

7694 Industrial Boulevard<br />

(218) 828-5700<br />

District Engineer: Robert Busch<br />

Project Manager: Jim Hallgren<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

18<br />

Page C7