Replace Bridge 86813 and 86814 with New Bridges 86819 and 86820 east of<br />

Monticello<br />

Bridge 86813, 86814, 86819, 86820<br />

<strong>State</strong> Project No. 8680-142<br />

Schedule:<br />

Environmental Document Approval Date: 05/11/2007<br />

Municipal Consent Approval Date: 03/23/2009<br />

Geometric Layout Approval Date: 10/22/2008<br />

Construction Limits Established Date:<br />

Original Letting Date: 05/15/2009<br />

Current Letting Date: 05/15/2009<br />

Construction Season: 2009-2010<br />

Estimated Substantial Completion: 2010<br />

Project History:<br />

Project was inititiated to address fatigue prone<br />

details in the bridge girders. Due to age of bridge<br />

and the ability to construct a shorter bridge, the<br />

district made a decision that it would be cost<br />

effective to replace the bridge. The shorter bridge<br />

eliminated having curved segments of the roadway<br />

on the bridge, which is a safety benefit. Auxiliary<br />

lanes will be added for the ramps from the County<br />

Road 18 interchange.<br />

Project Benefits:<br />

Improved bridge and improved safety due to<br />

shorter bridges and the addition of auxiliary lanes.<br />

Project Risks:<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

I 94<br />

Project Description:<br />

Replace I-94 bridges over railroad tracks and<br />

local road east of Monticello<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Recent Changes and Updates:<br />

Sherburne<br />

BR# 86814<br />

BR# 86813<br />

Wright<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 6.5<br />

Other Construction Elements: $ 0.0<br />

Engineering: $ 0.0<br />

Right of Way: $ 0.0<br />

Total:<br />

18<br />

14<br />

Monticello<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Cost estimate change due to additional grading costs related to new railroad clearance<br />

requirements. Current costs are based on Let costs<br />

Key Cost Estimate Assumptions:<br />

The final estimate was based on actual bid for the project.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 3<br />

7694 Industrial Boulevard<br />

(218) 828-5700<br />

District Engineer: Robert Busch<br />

Project Manager: Terry Humbert<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

Page C5