Schedule:<br />
Environmental Document Approval Date: Need Unknown<br />
Municipal Consent Approval Date: Need Unknown<br />
Geometric Layout Approval Date: Need Unknown<br />
Construction Limits Established Date: Need Unknown<br />
Original Letting Date: 2/26/2016<br />
Current Letting Date: 2/26/2016<br />
Construction Season: 2016<br />
Estimated Substantial Completion:<br />
Project History:<br />
New Project<br />
Project Benefits:<br />
Improve safety<br />
Project Risks:<br />
PROJECT SUMMARY<br />
Hwy. 24<br />
Replace Bridge 6557 over Mississippi River in Clearwater<br />
Parallel Bridge or Long Detour<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
Bridge 6557<br />
<strong>State</strong> Project No. 7108-23<br />
Project Description:<br />
This project was programmed to replace the<br />
Bridge # 6557 over the Mississippi River.<br />
The bridge was constructed in 1958. Due to<br />
the age of the bridge, size and cost, it<br />
should be included in the Highway<br />
Improvement program. The deck is<br />
deteriorating with 9.3% delamination. The<br />
deck geometry and traffic volumes are a<br />
safety problem for motorists and pedestrians.<br />
143<br />
145<br />
40<br />
75<br />
Stearns<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Construction Letting:<br />
Other Construction Elements:<br />
Engineering:<br />
Right of Way:<br />
Recent Changes and Updates:<br />
Key Cost Estimate Assumptions:<br />
BR# 6557<br />
Clearwater<br />
104<br />
8<br />
Wright<br />
7<br />
Baseline Est. Current Est.<br />
20.0<br />
2.0<br />
2.4<br />
5.0<br />
Total: $ 29.4<br />
$<br />
$<br />
$<br />
$<br />
Sherburne<br />
57<br />
Clear Lake<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 3<br />
7694 Industrial Boulevard<br />
(218) 828-5700<br />
District Engineer: Robert Busch<br />
Project Manager: Terry Humbert<br />
Original date of Posting: Jan 2010<br />
Revised Date: 1/15/2011<br />
Page C4