Schedule:<br />

Environmental Document Approval Date: Need Unknown<br />

Municipal Consent Approval Date: Need Unknown<br />

Geometric Layout Approval Date: Need Unknown<br />

Construction Limits Established Date: Need Unknown<br />

Original Letting Date: 2/26/2016<br />

Current Letting Date: 2/26/2016<br />

Construction Season: 2016<br />

Estimated Substantial Completion:<br />

Project History:<br />

New Project<br />

Project Benefits:<br />

Improve safety<br />

Project Risks:<br />

PROJECT SUMMARY<br />

Hwy. 24<br />

Replace Bridge 6557 over Mississippi River in Clearwater<br />

Parallel Bridge or Long Detour<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

Bridge 6557<br />

<strong>State</strong> Project No. 7108-23<br />

Project Description:<br />

This project was programmed to replace the<br />

Bridge # 6557 over the Mississippi River.<br />

The bridge was constructed in 1958. Due to<br />

the age of the bridge, size and cost, it<br />

should be included in the Highway<br />

Improvement program. The deck is<br />

deteriorating with 9.3% delamination. The<br />

deck geometry and traffic volumes are a<br />

safety problem for motorists and pedestrians.<br />

143<br />

145<br />

40<br />

75<br />

Stearns<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Construction Letting:<br />

Other Construction Elements:<br />

Engineering:<br />

Right of Way:<br />

Recent Changes and Updates:<br />

Key Cost Estimate Assumptions:<br />

BR# 6557<br />

Clearwater<br />

104<br />

8<br />

Wright<br />

7<br />

Baseline Est. Current Est.<br />

20.0<br />

2.0<br />

2.4<br />

5.0<br />

Total: $ 29.4<br />

$<br />

$<br />

$<br />

$<br />

Sherburne<br />

57<br />

Clear Lake<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 3<br />

7694 Industrial Boulevard<br />

(218) 828-5700<br />

District Engineer: Robert Busch<br />

Project Manager: Terry Humbert<br />

Original date of Posting: Jan 2010<br />

Revised Date: 1/15/2011<br />

Page C4