Schedule:<br />

Environmental Document Approval Date: Pending Approval<br />

Municipal Consent Approval Date: Need Unknown<br />

Geometric Layout Approval Date: Pending Approval<br />

Construction Limits Established Date: Pending Approval<br />

Original Letting Date: 11/16/2012<br />

Current Letting Date: 7/27/2012<br />

Construction Season: 2013<br />

Estimated Substantial Completion: 08/01/2014<br />

Project History:<br />

The expectation of this project is that the new<br />

bridge will be structurally redundant, replacing an<br />

in-place fracture critical truss. The existing<br />

structure was built in 1959 and has exhausted its<br />

useful life. It is functionally obsolete, so geometry<br />

and presumably safety will be enhanced.<br />

Project Benefits:<br />

Upgrading or replacement of a fracture critical<br />

structure will provide continued inter-state access.<br />

Project Risks:<br />

Need to coordinate project scheduling with<br />

emergency services, schools and transit, alternate<br />

alignments are limited due to proximity to existing<br />

infrastructure, closing the road during construction<br />

could prove to be politically difficult, several<br />

agencies are involved so an approval process is<br />

required. Seasonal flooding of Red River may<br />

provide construction difficulties.<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 1<br />

Red River of the North at Oslo<br />

Bridge 9100<br />

<strong>State</strong> Project No. 4509-05<br />

Project Description:<br />

Rehabilitate or replace Mn/DOT Bridge 9100<br />

over the Red River between <strong>Minnesota</strong> and<br />

North Dakota. If a new bridge is constructed<br />

there will likely need to be significant<br />

regrading on each approach.<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP: 12/21/2010<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 15.7<br />

$ 15.7<br />

Other Construction Elements: $ 0.5<br />

$ 0.5<br />

Engineering: $ 2.5<br />

$ 2.5<br />

Right of Way: $ 0.0<br />

$ 0.0<br />

Total: $ 18.7 $ 18.7<br />

Recent Changes and Updates:<br />

Key Cost Estimate Assumptions:<br />

RED R<br />

9100<br />

9<br />

22<br />

41<br />

139<br />

18<br />

17<br />

70<br />

64<br />

Marshall<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Safety will be improved as a result of upgrading or eliminating the current fracture critical<br />

structure and improving geometry.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 2<br />

3920 Highway 2 West<br />

(218) 755-6500<br />

District Engineer: Lynn C. Eaton<br />

Project Manager: Ray Gust<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

100<br />

Polk<br />

144<br />

19<br />

10<br />

4<br />

267<br />

20<br />

67<br />

23<br />

Page B2