Schedule:<br />
Environmental Document Approval Date: Pending Approval<br />
Municipal Consent Approval Date: Need Unknown<br />
Geometric Layout Approval Date: Pending Approval<br />
Construction Limits Established Date: Pending Approval<br />
Original Letting Date: 11/16/2012<br />
Current Letting Date: 7/27/2012<br />
Construction Season: 2013<br />
Estimated Substantial Completion: 08/01/2014<br />
Project History:<br />
The expectation of this project is that the new<br />
bridge will be structurally redundant, replacing an<br />
in-place fracture critical truss. The existing<br />
structure was built in 1959 and has exhausted its<br />
useful life. It is functionally obsolete, so geometry<br />
and presumably safety will be enhanced.<br />
Project Benefits:<br />
Upgrading or replacement of a fracture critical<br />
structure will provide continued inter-state access.<br />
Project Risks:<br />
Need to coordinate project scheduling with<br />
emergency services, schools and transit, alternate<br />
alignments are limited due to proximity to existing<br />
infrastructure, closing the road during construction<br />
could prove to be politically difficult, several<br />
agencies are involved so an approval process is<br />
required. Seasonal flooding of Red River may<br />
provide construction difficulties.<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 1<br />
Red River of the North at Oslo<br />
Bridge 9100<br />
<strong>State</strong> Project No. 4509-05<br />
Project Description:<br />
Rehabilitate or replace Mn/DOT Bridge 9100<br />
over the Red River between <strong>Minnesota</strong> and<br />
North Dakota. If a new bridge is constructed<br />
there will likely need to be significant<br />
regrading on each approach.<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP: 12/21/2010<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 15.7<br />
$ 15.7<br />
Other Construction Elements: $ 0.5<br />
$ 0.5<br />
Engineering: $ 2.5<br />
$ 2.5<br />
Right of Way: $ 0.0<br />
$ 0.0<br />
Total: $ 18.7 $ 18.7<br />
Recent Changes and Updates:<br />
Key Cost Estimate Assumptions:<br />
RED R<br />
9100<br />
9<br />
22<br />
41<br />
139<br />
18<br />
17<br />
70<br />
64<br />
Marshall<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Safety will be improved as a result of upgrading or eliminating the current fracture critical<br />
structure and improving geometry.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 2<br />
3920 Highway 2 West<br />
(218) 755-6500<br />
District Engineer: Lynn C. Eaton<br />
Project Manager: Ray Gust<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
100<br />
Polk<br />
144<br />
19<br />
10<br />
4<br />
267<br />
20<br />
67<br />
23<br />
Page B2