Schedule:<br />

Environmental Document Approval Date: 10/11/2010<br />

Municipal Consent Approval Date: Not Needed<br />

Geometric Layout Approval Date: Pending Approval<br />

Construction Limits Established Date: Assume no R/W need<br />

Original Letting Date: 11/20/2009<br />

Current Letting Date: 1/28/2011<br />

Construction Season: Spring 2011<br />

Estimated Substantial Completion: Fall 2011<br />

Project History:<br />

This section of Interstate 35 carries an average of<br />

15,900 vehicles per day, approximately 7% of<br />

which are classified as heavy commercial<br />

vehicles. Pavement modeling (based on current<br />

ride quality conditions, existing pavement type,<br />

and traffic levels) indicates this section of road will<br />

need pavement preservation to improve its ride<br />

quality and thereby extend its useful life.<br />

Project Benefits:<br />

Improved ride quality for road users, extend useful<br />

life<br />

Project Risks:<br />

Cross slope correction quantities are not<br />

determined until 90% design stage and could<br />

increase final concrete quantity estimates<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

I 35<br />

North of Sturgeon Lake to south of Mahtowa<br />

<strong>State</strong> Project No. 0980-138<br />

Project Description:<br />

Project begins 1.8 Miles south of the north<br />

Pine County Line and continues north to 2.6<br />

Miles south of Carlton County Road 4. All<br />

13.2 Miles of southbound lanes will be<br />

preserved with an unbonded concrete<br />

overlay. 4.5 Miles of the north lanes will be<br />

preserved with an unbonded concrete<br />

overlay. Traffic will be reduced to two-lanes<br />

during construction. Access to Barnum and<br />

Highway 73 at Moose Lake will be provided<br />

during construction.<br />

132<br />

134<br />

46<br />

160<br />

12<br />

Sturgeon Lake<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Recent Changes and Updates:<br />

61<br />

161<br />

167<br />

51<br />

35<br />

15<br />

Moose Lake<br />

12/21/2010<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 26.2<br />

$ 17.2<br />

Other Construction Elements: $ 1.7<br />

$ 0.9<br />

Engineering: $ 5.6<br />

$ 3.6<br />

Right of Way: $ 1.1<br />

$ 0.0<br />

Total: $ 33.5 $ 22.3<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

The scope changes of the projects led to the delay in Letting and considerable reduction in<br />

costs from the original estimate.<br />

Key Cost Estimate Assumptions:<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 1<br />

1123 Mesaba Ave<br />

(218) 725-2700<br />

District Engineer: Michael Robinson<br />

Project Manager: Todd Campbell<br />

Original date of Posting: Jan 2009<br />

Revised Date:<br />

46<br />

10<br />

50<br />

61<br />

137<br />

8<br />

162<br />

138<br />

13<br />

Page A9