Schedule:<br />

Environmental Document Approval Date: 12/30/2008<br />

Municipal Consent Approval Date: Pending Approval<br />

Geometric Layout Approval Date: Pending Approval<br />

Construction Limits Established Date: 11/14/2008<br />

Original Letting Date: 7/24/2009<br />

Current Letting Date: 4/2/2010<br />

Construction Season: 4/10- 9/12<br />

Estimated Substantial Completion: 10/1/2011<br />

Project History:<br />

Boundary Avenue to 26th Avenue East<br />

Bridge 69831, 69832, 69880<br />

<strong>State</strong> Project No. 6982-290<br />

http://www.dot.state.mn.us/d1/projects/i35-reconstruct/<br />

I-35 from Boundary Avenue to Mesaba Avenue<br />

was constructed in the 1960's. The pavement is<br />

highly deteriorated and has been frequently<br />

patched. There are major bridges on the segment<br />

with substandard widths and fracture critical<br />

elements. Forty-six bridges in the corridor will<br />

require new railings, deck repairs and painting. I-<br />

35 from Mesaba Avenue to 26th Avenue East was<br />

opened in 1992 and requires concrete pavement<br />

repairs.<br />

Project Benefits:<br />

Replace fracture critical Bridges, improve ride and<br />

safety, extend the life of Bridges, reduce<br />

maintenance costs<br />

Project Risks:<br />

High traffic volumes, extremely poor soils, tight<br />

construction schedule for 3 years, limited access,<br />

weather<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

I 35<br />

Project Description:<br />

The project is located in Duluth (St. Louis<br />

County) from Boundary Avenue to 26th.<br />

Avenue East. The proposed project includes<br />

Bridge and pavement replacement and<br />

repair, a new access road, culverts, ramp<br />

repairs, signing and lighting.<br />

Hermantown<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Recent Changes and Updates:<br />

Project is Let and first year of construction is complete.<br />

Key Cost Estimate Assumptions:<br />

56<br />

91<br />

89<br />

54<br />

90<br />

Saint Louis<br />

Duluth<br />

Lake Superior<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 75.0<br />

$ 66.1<br />

Other Construction Elements: $ 3.0<br />

$ 3.3<br />

Engineering: $ 15.0<br />

$ 13.2<br />

Right of Way: $ 0.6<br />

$ 2.6<br />

Total: $ 93.6 $ 85.2<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 1<br />

1123 Mesaba Ave<br />

(218) 725-2700<br />

District Engineer: Michael Robinson<br />

Project Manager: Roberta Dwyer<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

Page A7<br />