Tender Specifications - ECHA - Europa
Tender Specifications - ECHA - Europa
Tender Specifications - ECHA - Europa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Annex II – <strong>Tender</strong> <strong>Specifications</strong> (Invitation to <strong>Tender</strong> No [complete] of [insert date])<br />
Annex III – Contractor's <strong>Tender</strong> (No [complete] of [insert date])<br />
Annex IV – Reimbursement of daily subsistence allowances<br />
Annex V – Contract performance guarantee – Model performance guarantee<br />
Annex VI – Contract pre-financing guarantee – Model pre-financing guarantee<br />
which form an integral part of this contract (hereinafter referred to as “the Contract”).<br />
- The terms set out in the Special Conditions shall take precedence over those in the other<br />
parts of the Contract.<br />
- The terms set out in the General Conditions shall take precedence over those in the model<br />
order form and model specific contract (Annex I)<br />
- The terms set out in the model order form and model specific contract (Annex I) shall take<br />
precedence over those in the other Annexes.<br />
- The terms set out in the <strong>Tender</strong> <strong>Specifications</strong> (Annex II) shall take precedence over those in<br />
the <strong>Tender</strong> (Annex III).<br />
- The terms set out in the Contract shall take precedence over those in the order forms and<br />
specific contracts.<br />
- The terms set out in the specific contracts shall take precedence over those in the Requests<br />
for Services.<br />
- The terms set out in the Requests for Services shall take precedence over those in the<br />
specific tenders.<br />
Subject to the above, the several instruments forming part of the Contract are to be taken as<br />
mutually explanatory. Ambiguities or discrepancies within or between such parts shall be explained<br />
or rectified by a written instruction issued by the Agency, subject to the rights of the Contractor<br />
under Article I.9 should he dispute any such instruction.<br />
64