IUCLID (LOT 3)<br />
IUCLID 5 plays a central role in the IT environments of all organisations that have to cope with data<br />
submission requirements of REACH and other programmes (OECD HPV, EU Biocides and others).<br />
Industry stakeholders, EU Member States, the European Chemicals Agency (<strong>ECHA</strong>), and any<br />
other interested party obtain the IUCLID installation kit from the IUCLID 5 website; once installed,<br />
the local IUCLIDs are the essential tool to capture & store, submit, and exchange data on chemical<br />
substances stored according the format of the OECD Harmonized Templates. IUCLID 5 was first<br />
release in June 2007. Maintenance and further development of IUCLID 5 are foreseen to happen in<br />
the coming years, as well as a revision of the software architecture leading to a new version<br />
release i.e. IUCLID 6.<br />
The implementation of IUCLID 5 was first assigned to a Contractor in November 2004 to perform<br />
the development at the Contractor’s premises. After the completion of the release of IUCLID 5.0 in<br />
June 2007, the progressive maintenance of the application was performed by the same Contractor<br />
until February 2011 with the release of IUCLID 5.3. Work for the continuation of the project<br />
(progressive maintenance) was then assigned to another Contractor, who is currently working on<br />
further developing the system at his own premises. During the execution of the project and until<br />
now, the testing is being performed both at JRC/<strong>ECHA</strong> premises by the business team units and by<br />
the main representatives of industry through the OECD IUCLID working group.<br />
CHESAR (LOT 3)<br />
It is an IT tool to support industry in preparing their Chemical Safety Assessment/Report which is to<br />
be submitted as part of their registration dossiers. It also supports the generation of exposure<br />
scenarios to be annexed to Safety Data Sheet. The requirements underpinning CHESAR were<br />
specified by internal staff of the Agency working in close collaboration with industry stakeholders.<br />
A team of intra-muros consultants began software development in 2009 and produced Chesar 1.0<br />
and 1.1 in 2010 and Chesar 1.2 in 2011. Chesar 2 is now being developed (again by a team of<br />
intra-muros consultants) to better support the needs of registrants and to facilitate the extension of<br />
the application in the future. This version will then be expanded to provide additional functionalities.<br />
In particular the link with additional exposure estimation tools will have to be developed in the<br />
future.<br />
At the start of 2012 it is foreseen that a new Contractor will take over responsibility for the<br />
development, testing and subsequent maintenance of Chesar 2. During the first part of 2012 the<br />
new Contractor will work on site at <strong>ECHA</strong>. They will then continue working off site. It is currently<br />
envisaged that at the beginning of 2013 another transition period will take place in which a new<br />
Contractor (based on the results of the relevant procurement process) will take over and<br />
continue development, testing and maintenance activities.<br />
ODYSSEY (LOT 3)<br />
It is a system supporting <strong>ECHA</strong> in dossier evaluation by providing efficient instructions, consistency<br />
and reporting tools for the assessment tasks carried out by the scientific officers.<br />
The design and requirements specification were driven by a team mixing internal staff and intramuros<br />
consultants during 2009 and first half of 2010. The proof of concept was made available in<br />
July 2009. The implementation was assigned to a team of intra-muros consultants in Spring 2010.<br />
Currently the system is both supported in production since February 2011 and being further<br />
developed by a team of intra-muros consultants whose composition is being updated based on the<br />
needs and the running contracts.<br />
A number of new versions have been deployed in production. The release plan of the subsequent<br />
versions has been set until Q1/2013. Beyond this, there will be a need to support the system in<br />
production and any potential further development.<br />
DATA INTEGRATION PROJECT (impacting systems of all lots)<br />