The implementation of the first version of eCHEM (v1.0) was assigned to Contractor X, who<br />
developed the system at his premises.<br />
eCHEM v1.0 was released in production in January 2011. Since then, the system is supported<br />
in production by Contractor X, who provides services remotely from his premises (e.g. to deliver<br />
patches that correct bugs identified in production).<br />
Now there is a need to implement the next version of eCHEM (v2.0), which<br />
a. (for all lots) will allow the companies to submit their dossiers according to the updated related<br />
EU regulations (which require the companies to submit additional information)<br />
b. for lot 3 only: will include a new plug-in component that the companies will be able to<br />
download and install locally in order to preview and check their dossier before it is submitted to<br />
<strong>ECHA</strong> (through the main eCHEM system). This plug-in is foreseen to operate on different user<br />
environments: Win32, Win64, Oracle DB and PostgreSQL).<br />
The data submitted by the companies using eCHEM are highly confidential and as such<br />
ensuring high security of eCHEM is critical.<br />
The Contractor who will undertake the development of eCHEM v2.0 is required to follow the<br />
principles of an agile methodology for the execution of the project.<br />
<strong>ECHA</strong> is a dynamic environment; priorities and requirements are adjusted frequently in order to<br />
respond to shifts in the external and internal priorities and requirements; As such, the project<br />
management methodology needs to be able to respond to emergencies, changes in<br />
requirements and shifts in short term (1 to 3 months) development priorities.<br />
Tasks<br />
The contractor is required to provide services for the completion of the following tasks:<br />
• Task 1: Collaborating with the Agency and Contractor X in order to build up the necessary<br />
knowledge and technical capacity and infrastructure to ensure smooth continuation of the<br />
work after Contractor X shifts out of the project (concerning both the implementation for<br />
eCHEM v2.0 and the support of eCHEM v1.0 in production). .<br />
• Task 2: Performing business analysis and specifying the business requirements that will be<br />
implemented in eCHEM v2.0.<br />
• Task 3: Designing and developing the software components required for eCHEM v2.0 and<br />
integrating them into the existing versions of eCHEM v1.0.<br />
• Task 4: Performing necessary testing to ensure delivery of results at the expected quality<br />
(and in accordance with the specified functional and non functional specifications).<br />
• Task 5: Deploying eCHEM v2.0 in production.<br />
• Task 6: Supporting eCHEM v1.0 in production during the whole duration of the project for<br />
implementing eCHEM v2.0.<br />
Project Management methodology<br />
The methodology to be used for project management should be based on Agile principles.<br />
Duration of project<br />
12 months (from 02/2012 until 02/2013)<br />
Size and composition of the team of the Agency<br />
Lot 1:<br />
The team of the Agency that will participate in the project consists of 12 persons. This team<br />
includes the following profiles: Project Manager, Business Analysts, Quality Manager,<br />
Information System Testers.<br />
Lot 2:<br />