Tender Specifications - ECHA - Europa
Tender Specifications - ECHA - Europa
Tender Specifications - ECHA - Europa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
5.7 Calculation of Overall Weighted Price<br />
This Annex describes the way in which the overall weighted price, that constitutes basis for the assessment of the financial award criterion, is<br />
calculated in order to be evaluated as described in section 3.3.1.<br />
For each profile:<br />
• The onsite (at <strong>ECHA</strong> premises) price has a specific weight ([weight for onsite performance]) and its value is defined as listed in column b<br />
of the table below.<br />
• The offsite (at Contractor’s premises) price has a specific weight ([weight for offsite performance]) and its value is defined as listed in<br />
column d of the table of the table below.<br />
• It is true that [weight for onsite performance] + [weight for onsite performance] = 100%<br />
• The [price weighted per place of performance] is defined as:<br />
{ ([weight for onsite performance] x [price for onsite performance]) } + { ([weight for offsite performance] x [price for offsite performance]) }<br />
Profiles<br />
Weight for<br />
onsite performance<br />
Price onsite<br />
in €/person<br />
day<br />
Weight for<br />
offsite performance<br />
Price offsite<br />
in €/person<br />
day<br />
Price weighted per<br />
place of performance<br />
(in €)<br />
Result of<br />
(b x c ) + (d x e)<br />
(column a)<br />
(column b)<br />
(column c)<br />
(column d)<br />
(column e)<br />
(column f)<br />
Senior Project Manager 30% 70% 0.0<br />
Junior Project Assistant 20% 80% 0.0<br />
Quality Consultant 25% 75% 0.0<br />
Senior Security<br />
Consultant<br />
25% 75% 0.0<br />
Junior Security<br />
Consultant<br />
15% 85% 0.0<br />
Senior Analyst 50% 50% 0.0<br />
Junior Analyst 30% 70% 0.0<br />
122