After the applicable retention period, the heavily chlorinated water shall be flushed<br />

from the main until the chlorine concentration in the water leaving the mains is no<br />

higher than that generally prevailing in the system or less than 1 mg/l.<br />

After final flushing and before the water main is placed in service, a sample or<br />

samples shall be collected from the end of the line and tested for bacteriological<br />

quality and shall show the absence of coliform organisms. If the initial disinfection<br />

fails to produce satisfactory samples, disinfection shall be repeated until satisfactory<br />

samples have been obtained. When the samples are satisfactory, the main may be<br />

placed in service.<br />

The contractor is expected to carry out the disinfection work as a part of laying the<br />

pipes and his rates for laying the pipes should include the disinfection and other<br />

connected works till the main is placed in service unless otherwise specified in the<br />

schedule.<br />

GTS : General Technical specification. Page 92