Cement bags brought to the site must be stored in water tight shed as approved by<br />

the EIC. Any cement damage by water or otherwise, defective cement shall have to<br />

be removed from the site of work at once. Grade of cement to be used in the work<br />

as stated above shall be approved by the EIC before use.<br />

Reinforcement.<br />

Reinforcement steel bars : Fe 415 HYSD conforming to IS: 1786 shall be used. The<br />

bidder shall inform the Engineer incharge prior to start of work, regarding the type<br />

of steel to be used by him in the works and get them approved accordingly.<br />

Straightening, shaping to form and Cutting steel works : The steel section shall be<br />

straightened and cut to lengths specified and measured with a steel tape. The cut<br />

ends shall be finished smooth. No two pieces shall be welded to make up the<br />

required length of a member.<br />

Hoisting and placing in Position the steel bars : Steel work shall be hoisted and<br />

placed in position carefully and in most cases mechanical appliances such as lifting<br />

tackle, winch and derrick, etc. shall be used. Minimum diameter/thickness of steel<br />

members including angles, which comes in contract with water, will not be less than<br />

6 mm. R.S. Joist shall be used where necessary as per specification.<br />

All types of steel material shall be of tested quality as per specification stated<br />

above. The steel materials shall be free from oil, dirt and loose rust. Any scale or<br />

loose rust shall be removed before use for which extra claim shall not be<br />

entertained.<br />

Painting.<br />

Painting for prevention of rust : Before hoisting, steel work including RSJ shall be<br />

thoroughly cleaned by giving one coat of red oxide paint of approved quality and<br />

after erection two coats of synthetic enamel paint. However covered surfaces shall<br />

be given 2 coats of synthetic enamel paint before erection. The paint shall be of<br />

approved manufacturer and as per the direction of Engineer-in-Charge.<br />

Under water structural steel work shall be finished with anticorrosive paint of<br />

approved make before erection except for the surface coming in contact with<br />

concrete. Special care shall be taken for cleaning of corners. Painting shall be<br />

carried out during dry weather and according to the manufacturer’s specification<br />

and relevant IS code.<br />

GTS : General Technical Specification. Page 7