At the end of each day, the end of the pipe should be plugged to prevent entry of<br />

rodents, foreign substances, water etc.<br />

11.6 Support of pipe for nallah/river crossing.<br />

Venteak piles are proposed for portion of pipeline which crosses the nallah/river or<br />

slushy soils. Each pipe shall be supported on a pair of Venteak piles driven upto<br />

3.50m or firm ground whichever is met earlier.<br />

One pair of timber piles shall be driven about 150mm behind the shoulder of toe<br />

socket and another pair about 750mm in front of the spigot end of the pipe.<br />

The size of timber section to be used for Venteak piles shall be:<br />

100mm x 100mm for pipe sizes upto 300mm<br />

150mm x 150mm for pipe sizes above 300mm<br />

A cross piece of section same as that of pile shall be bolted to a pair of piles which<br />

have been driven to the required depth.<br />

The level of the cross piece should be such that when the pipe rests on its top, its<br />

Invert level coincides with the proposed invert of the pipe.<br />

The pipe shall be aligned for straightness and secured in position by wooden<br />

wedges nailed down to the wooden cross piece.<br />

The spigot end of each pipe shall be thoroughly homed in to socket of preceding<br />

pipe and jointing made.<br />

The pipe shall be further secured from moving upwards by timber crosspieces<br />

bolted to the supporting piles. The section of the crosspiece shall be same as that of<br />

pile.<br />

The socket ends of all pipes shall face up hill irrespective of the direction of water<br />

flow. Any deviation either in plan or elevation of less than 11 ¼ deg. angle shall<br />

usually be effected by laying straight pipes round a flat curve, of such radius that<br />

rubber gasket shall not be disturbed in its place.<br />

Wherever new pipes laid are to be jointed with existing pipeline, first pipe laying<br />

work of new pipes are to be completed. Jointing of new pipe line with existing pipe<br />

line has to be completed within a stipulated time as per the instructions of Engineer<br />

in charge to keep the distribution system ready to supply water to the city. No extra<br />

payment will be made for this time bound urgent work.<br />

GTS : General Technical specification. Page 87