Steel brought on site shall be stored in a proper manner as approved by the engineer<br />

so as to avoid distortion, deterioration and corrosion. The contractor shall maintain<br />

proper registers for the steel account, showing the steel received at site, steel used,<br />

and the balance stock on site, to the entire satisfaction of the Engineer. Further, it<br />

shall be obligatory on the part of the contractor to submit monthly, quarterly and<br />

yearly statements giving the full account of steel on the works and the balance on<br />

hand.<br />

9.12 Anti corrosive treatment for reinforcement.<br />

The item covers providing fusion bonded epoxy coating not less than 175 microns<br />

thickness and upto 300 microns to reinforcement steels bars of all diameters as per<br />

IS Code 13620-1993 for RTS rods for RCC works including testing of coating at<br />

plant.<br />

GTS : General Technical Specification. Page 76