(viii) Increased cover thickness shall be provided for surfaces exposed to the action<br />

of harmful chemicals or exposed to earth contaminated by such chemicals<br />

acids, alkalis, saline atmosphere, sulphurous smoke etc. and such increase of<br />

cover may be between 15mm and 50mm beyond the figures mentioned here<br />

as may be specified by the Engineer.<br />

(ix) For liquid retaining structures, the minimum cover to all steel shall be 40mm<br />

or the diameter of the main bar, whichever is greater. In the presence of soils<br />

and waters of a corrosive character, the cover shall be increased by 10mm.<br />

(x) The correct cover shall be maintained by cement mortar cubes or other<br />

approved means. Reinforcement for footing, grade beams and slabs on sub<br />

grade shall be supported on precast concrete blocks as approved by the<br />

Engineer. The use of pebbles or stones shall not be permitted.<br />

(xi) The 28 day crushing strength of cement mortar cubes/precast concrete cover<br />

blocks shall be at least equal to the specified strength of concrete in which<br />

these cubes/blocks are embedded.<br />

(xii) The minimum clear distance between reinforcing bars shall be in accordance<br />

with IS:456.<br />

9.10 Inspection.<br />

All continuous inspections shall be performed by the engineer’s representative.<br />

Erected and secured reinforcement shall be inspected and approved by the Engineer<br />

prior to placement of concrete.<br />

9.11 Reinforcement Bars Procurement.<br />

Steel reinforcement, such as M.S. bars, High yield strength deformed bars etc.,<br />

required for the works shall be procured by the contractor. The contractor shall<br />

arrange for transport, loading, unloading and storage at the work sites. The<br />

contractor should plan the procurement of steel in such a way that at least required<br />

quantity of steel of specified sizes is available at site for 3 months period.<br />

GTS : General Technical Specification. Page 75