For walling pieces round timber shall not be allowed. In a vertical plane, there shall<br />

be at least three struts or more as directed by the Engineer. They shall rest on<br />

walling pieces. The spacing of the struts shall be as per the requirement of the<br />

design. At the bottom, extra struts shall have to be provided if ordered by the<br />

Engineer. The rates for excavation do not include the cost of shoring, which shall<br />

be paid for separately as per relevant item of the bill of quantities. The contractors<br />

shall be held responsible for providing secure shoring, and for adopting every other<br />

precaution, which may be necessary for protecting nearby structures, which are<br />

likely to be damaged as a result of excavation. The contractors shall design the<br />

shoring required for actual site conditions and shall provide shoring accordingly.<br />

The design shall be submitted to the Engineer on demand. The shoring shall be so<br />

designed that lowering of pipe of normal length or any other pipe laying operation<br />

does not necessitate the removal of any strut or any other member of shoring. If the<br />

Engineer requires the adoption of any special measures or precautions, the<br />

contractor will comply with the same immediately. If any part of a nearby structure<br />

is cut out or removed for facility of work, the same shall be made good on<br />

completion of the work by the contractors at their cost.<br />

In the event of the contractors not complying with the provisions of this contract in<br />

respect of shoring the <strong>Engineering</strong> may, with or without notice to the contractors,<br />

put up shoring or improve shoring already put up or adopt such other measures as<br />

he may deem necessary, the cost of which shall be recovered from the contractors.<br />

Such action on the part of the Engineer, shall not, however absolve the contractors<br />

of their responsibilities under this contract.<br />

No part of the shoring shall, at any time, be removed by the contractors without<br />

obtaining permission from the Engineer. While taking out shoring planks, the<br />

hollows formed shall be simultaneously filled in with soft earth and shall be well<br />

compacted as directed.<br />

5.22 Quality control test.<br />

Trenches other than in roads and paved areas shall be backfilled as specified in<br />

Clause 5.19.<br />

GTS : General Technical Specification. Page 42