maintained. In addition to the normal lighting arrangements, the Contractor shall<br />

provide, whenever such work is in progress, battery operated blinking lights<br />

(6 volts) in the beginning and end of a trench with a view to provide suitable<br />

indication to the vehicular traffic. The Contractor shall also provide and display<br />

special boards printed with fluorescent prints indicating the progress of work along<br />

the road. In the event of the Contractor not complying with the provisions of the<br />

clause, it may be carried out by the Engineer and the cost recovered from the<br />

Contractor besides claiming liquidity damages from the contractor. In all such<br />

cases the work may be carried out by Board. The Contractor shall be held<br />

responsible for all claims for compensation as a result of accident or injury to<br />

persons/non-provision of red flags.<br />

The Contractor shall at his own cost provide all notice boards before opening of<br />

roads as directed by the Engineer.<br />

Arrangements shall be made by the Contractor to obtain permission from traffic<br />

authorities for working and to direct traffic when work is in progress. No separate<br />

payment shall be paid for this item of work.<br />

5.19 Refilling trenches.<br />

a) With a view to restrict the length of open trenches, on completion of the pipe laying<br />

operations, refilling of trenches shall be started immediately by the Contractor.<br />

Pipe laying and testing shall follow closely upon the progress of trench excavation<br />

and the Contractor shall not be permitted more than 500 metres of trench<br />

excavation to remain open while awaiting testing of the pipe line.<br />

b) Care shall be taken while back filling, not to injure or disturb the pipe. Filling shall<br />

be carried out simultaneously on both the sides of the pipes so that unequal pressure<br />

does not occur.<br />

c) Walking or working on the completed pipelines shall not be permitted unless the<br />

trench has been filled to a height of at least 30cm over the top of the pipe except as<br />

may be necessary for tamping etc., during back filling work.<br />

d) Filling-in shall be done in layers not exceeding 150mm in thickness accompanied<br />

by adequate watering, ramming etc. so as to get good compaction upto 300mm<br />

above the top of the pipe. Above this level, river sand shall be placed in layers of<br />

200mm watered and compacted by tamping.<br />

e) The trench shall be refilled so as to build up to the original ground level, keeping<br />

due allowance for subsequent settlement likely to take place.<br />

GTS : General Technical Specification. Page 40