5.12 Excavation for appurtenance.<br />

Excavation in trenches for foundation of valve chambers, pedestals etc. shall be as<br />

per the plan or as directed by the Engineer. The dimensions of the excavation shall<br />

be measured as the projection in plan of the outermost edges of the structure.<br />

5.13 Keep excavation clear of water.<br />

Where ground water is encountered or anticipated, the Contractor shall provide<br />

sufficient pumps to handle the ingress of water and must provide and maintain in<br />

working order. Standby pumping units are to be made available and employed in<br />

the event of mechanical failure. The Contractor must also arrange for night and day<br />

operation of the pumps wherever necessary to ensure that the work proceeds at all<br />

times.<br />

5.14 Dewatering in areas of high water table.<br />

The Contractor shall perform dewatering as required so that all works of the<br />

contract are installed on dry areas and excavations, including without limitation the<br />

construction of all structures and underground piping. The Contractor shall ensure<br />

that dewatering is carried out only to a depth sufficient for the required excavation.<br />

The Contractor shall also ensure that, at all times, during construction, no<br />

groundwater shall come into contact with any concrete surface or reinforcement and<br />

that any structure shall be capable of withstanding any hydrostatic pressure to which<br />

it may be subjected during construction and until completed.<br />

The Contractor shall be deemed to have included in the tender price for maintaining<br />

all works in a dry condition during construction. Any water removed from<br />

excavations shall wherever practicable, be pumped directly to the natural drainage<br />

channel or to storm sewers if approved via an efficient system of discharge lines.<br />

No water may be discharged into the sewerage system or onto open spaces.<br />

The Contractor shall include for the diversion of all water courses encountered in<br />

the work until the scheme is completed and put into operation.<br />

Notwithstanding any previous approval, the Contractor shall be fully responsible for<br />

maintaining dry excavations.<br />