5.4 Trench excavation.<br />

General: Trench excavation means excavation of trenches into which the pipe is to<br />

be laid. Before commencing trench excavation, the route of the trenches shall be<br />

pegged out accurately and the natural ground levels and the alignment shall be<br />

agreed with the Engineer in charge. The contractor shall dig probing pits or<br />

appropriate size and depth including cutting the road at every 100m interval or as<br />

directed by Engineer in charge.<br />

Stripping surface materials: Before the surface of any part of the site is disturbed<br />

or the works there on are started, the Contractor shall take and record levels in the<br />

presence of the Engineer or his representative. Before commencing the excavation,<br />

the surface materials shall be carefully stripped and set aside for reuse as directed<br />

by the Engineer.<br />

5.5 Width of trench.<br />

The width of the trench at bottom between the faces of sheeting shall be nominal<br />

diameter of the pipe plus 300mm clearance on either side of the pipe. Trenches<br />

shall be of such extra width, when required as will permit the convenient placing of<br />

timber supports, strutting and planking and handling of specials.<br />

The width of trenches measured at the crown of the pipe shall permit adequate<br />

working space. The trenches shall be widened at sockets and other structures as<br />

may be found necessary.<br />

Care should be taken to avoid excessive trench width and thereby increasing the<br />

load on the pipes.<br />

5.6 Depth of excavation of trenches.<br />

The depths for the trenches will be calculated from the surface to the bed of the<br />

pipes and in case when a layer of bedding is to be placed below the pipeline, the<br />

depth to the bottom of the bedding will be paid.<br />

GTS : General Technical Specification. Page 34