4.2 Measurement and payment.<br />

The measurements of work shall be exact length and width and height of the<br />

dismantled structure. It shall be priced per unit of the Cubic metre. Any excavation<br />

that may be necessary for dismantling the structure below 45cm from ground level<br />

shall be paid under the item of Excavation and shall include labour for refilling,<br />

watering and ramming, spreading on site if required and for disposal of surplus<br />

earth.<br />

GTS : General Technical Specification. Page 32