3.4 Pavement removal.<br />

The Contractor must inform the other concerned departments well in advance<br />

before starting the work. The Contractor must provide and maintain proper and<br />

efficient traffic control system such as safety lamps, sign boards etc. operating day<br />

and night for the full duration of work. The employer shall not be responsible under<br />

any circumstances for any mishappenings therefore. For the purpose of payment<br />

for removal of pavement, steel tapes are to be used and the Engineer’s<br />

representative and Contractor or his representative shall take the measurement<br />

jointly. The width of trenches shall be as per the specification drawing and only<br />

such widths shall be taken into account for computing quantities for payment. The<br />

Contractor has to pay restoration charges for width excavated in excess of<br />

prescribed width. For other elements of work such as making cross connections,<br />

fixing other appurtenances etc. the Engineer shall prescribe the dimensions for<br />

removal of pavement from time to time.<br />

3.5 Maintenance of traffic and closing of streets.<br />

The work shall be carried out in such a manner, which will cause the least<br />

interruption to traffic, and road/street may be closed in such a manner that it causes<br />

the least interruption to traffic. Where it is necessary for traffic to cross open<br />

trenches, suitable bridges shall be provided. Suitable signs indicating that a street is<br />

closed shall be placed and necessary detour signs for the proper maintenance of<br />

traffic shall be provided.<br />

3.6 Interruption to service.<br />

No valve or other control of the existing services shall be operated with out the<br />

permission of the authority.<br />

3.7 Work during nights.<br />

No extra payment will be made for doing the work in the nights. The Contractor<br />

shall get prior approval from the Engineer in charge before starting the work during<br />

nights.<br />

GTS : General Technical Specification. Page 30