16.08.2013 Views

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

PACKAGE : I Bid Document VOLUME : II - Public Health Engineering

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.3 Samples.<br />

The Contractor has to submit samples of all materials used for the work prior to<br />

start of the works and get the approval of the Engineer in charge. He shall label or<br />

tag each sample or set of samples, identifying the manufacturer’s name and address,<br />

brand name, catalogue number, project title he intends use.<br />

2.4 Material lists and equipment data.<br />

The Contractor has to submit all material lists, equipment lists etc. well in advance<br />

before starting the work and get the approval of the Engineer in charge.<br />

GTS : General Technical Specification. Page 28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!