1.1 Materials.<br />

Chapter 1<br />

General Technical Specification<br />

The term “Materials” shall mean all materials, goods and articles of every kind<br />

whether raw, processed or manufactured and equipment and plant of every kind to<br />

be supplied by the Contractor for incorporation in the works.<br />

All materials shall be new and of the kinds and qualities described in the contract<br />

and shall be at least equal to approved samples.<br />

Materials shall be transported, handled and stored in such a manner as to prevent<br />

deterioration, damage or contamination failing which such damaged materials will<br />

be rejected and shall not be used on any part of the works under this contract.<br />

1.2 Samples and tests of materials.<br />

The Contractor shall submit samples of such materials as may be required by the<br />

Engineer and shall carry out the specified tests directed by the Engineer at the site,<br />

at the supplier’s premises or at a laboratory approved by the Engineer.<br />

Samples shall be submitted and tests shall be carried out sufficiently early to enable<br />

further samples to be submitted and tested if required by the Engineer.<br />

The Contractor shall give the Engineer minimum fifteen days notice in writing of<br />

the date on which any of the materials will be ready for testing or inspection at the<br />

supplier’s premises or at a laboratory approved by the Engineer. The Engineer or<br />

his nominee shall attend the test at the appointed place within fifteen days of the<br />

said date on which the materials are expected to be ready for testing or inspection<br />

according to the Contractor, failing which the test may proceed in his absence<br />

unless instructed by the Engineer to carry out such a test on a mutually agreed upon<br />

date in his presence. The Contractor shall in any case submit to the Engineer within<br />

seven days of every test such number of certified copies (not exceeding six) of the<br />

test readings as the Engineer may require.<br />

Approval by the Engineer for placing orders for materials or for samples or tests<br />

shall not prejudice any of the Engineer’s powers under the Contract particularly<br />

under the provisions of General Conditions of Contract.<br />

The provisions of this clause shall also apply to materials supplied under any<br />

nominated sub-contract.<br />