Though the wall thickness of the pipes for rising main may be sufficient to<br />

withstand very severe surge pressure, the valves in the pump house including the<br />

delivery manifold is required to be properly selected so as to prevent the damage of<br />

the machineries in the event of sudden tripping of pumps as a result of power<br />

failure. In the case of intermediate pumping station, the picture is comparatively<br />

worsen as the total head is comparatively higher. In such a situation, water<br />

hammering would be quite severe in the event of power failure. Considering the<br />

total pump head, the valves inside the pump house including the delivery manifold<br />

should have a working pressure of not less than 1.5 times the working pressure. Non<br />

return valves on the individual pump delivery lines are proposed to be provided<br />

with dash pot arrangement to dampen the rate of closure towards the end of closure.<br />

Air valves are to be provided in the rising main.<br />

Technical specification of the horizontal split casing pump.<br />

Codes and Standards : Has been detailed elsewhere in this document.<br />

Design and Performance Requirement : Has been detailed elsewhere in this<br />

document.<br />

Drawing, data, curves and manuals : Has been detailed elsewhere in this<br />

document.<br />

Materials of construction : Has been detailed elsewhere in this document.<br />

Inspection and Testing : Has been detailed elsewhere in this document.<br />

Packing for Transportation : Has been detailed elsewhere in this document.<br />

Technical specification for the drive motors : Has been detailed elsewhere in this<br />

document.<br />

Design & Operational requirement : Has been detailed elsewhere in this<br />

document.<br />

Detail Particulars : Has been detailed elsewhere in this document.<br />

H.T Power Distribution Panel Board : Has been detailed elsewhere in this<br />

document.<br />

L.T. 415V, Power Distribution Panel Board : Has been detailed elsewhere in this<br />

document.<br />

Motor Control Centre : Has been detailed elsewhere in this document.<br />

DTS : Detailed Tender Specification. Page 275