The <strong>Bid</strong>der shall also furnish the details of foundation of the electrical Panel Board,<br />

pipes, valves and special etc. The <strong>Bid</strong>ders are advised to give a confirmation on<br />

clear term that the layouts are acceptable to them fulfilling all technical<br />

requirements of their offered equipments. The equipment layout details, data etc.<br />

are to be clearly incorporated in the layout drawings by the <strong>Bid</strong>ders and are to be<br />

submitted along with the offer.<br />

23.4 Information to the <strong>Bid</strong>ders to work out the system.<br />

The following factors are to be considered in design and selection of pumping<br />

machineries :<br />

Daily demand of water = 4.36mld.<br />

Hours of pumping = 20 Hrs/Day.<br />

RL of water level at the<br />

Clear water RCC sump = 1772.00+ water level in the<br />

sump.<br />

Dia of rising main = 0.30m<br />

Length of rising main = 6750Rm.<br />

Material of rising main = DI pipe.<br />

RL at point of discharge<br />

(site for construction of Reservoirs) = 1935.00m<br />

Number of pumps to be installed = 2 Nos.<br />

Duty pump = 1 No.<br />

Standby pump = 1 No.<br />

Type of liquid to be pumped = Clear water.<br />

In the design selection of pumping machineries for Intermediate pumping station,<br />

the following conditions are to be taken into consideration.<br />

The datas given above with reference to RL are indicative and are not to be<br />

considered as final. After finalisation of tender, if any change in the site, RL s,<br />

resulting in change of operating head of the pumps, the contractor should arrange<br />

design & selection of pumping plant/machineries for approval by the department<br />

before proceeding for order of the same. The contractor are required to visit the site,<br />

conduct survey, collect necessary datas required in designing and selection of<br />

suitable pumping plant/machineries. The detail design calculation including<br />

selection of type of pumps, motor, motor control center including type of starters,<br />

cabling and valves inside the pump house viz. Sluice/butterfly valves and Nonreturn<br />

valves are to be furnished along with the tender.<br />

DTS : Detailed Tender Specification. Page 274