The contractor shall assume full responsibility to make the project complete<br />

perfectly keeping the intent and requirement of the project in mind.<br />

The <strong>Bid</strong>der shall furnish with the technical offer, the detail system head calculation.<br />

The <strong>Bid</strong>ders’ in their technical offer shall clearly mention the ‘Make’ of the<br />

equipments they shall offer for the job which shall strictly be selected from the<br />

annexed vendor list of equipments. Detail technical information, brochure, literature<br />

and specifications shall also be submitted with the offer. Since the tender is a<br />

complete package of Civil and Electromechanical works and the <strong>Bid</strong>ders may not<br />

be essentially the reputed pump manufacturer or manufacturer of well<br />

repute for other major components like Motors, H.T./L.T. Boards, Control and<br />

Instrumentation panel, capacitor Bank etc. The <strong>Bid</strong>ders along with the technical<br />

offer, shall have to furnish a back to back guarantee from the respective<br />

manufacturers of major components as per annexure/line of confirmation to this<br />

effect.<br />

However the guarantee from the manufacturers’ will not relieve the contractor from<br />

their responsibility of executing the job successfully as per intent, terms and<br />

conditions of the tender. The drive and the driven unit shall be considered as one<br />

composite item and the performance of the whole composite item should be<br />

guaranteed for.<br />

23.3 Salient features for installation.<br />

The salient feature of horizontal split casing pumps is detailed out elsewhere in this<br />

document.<br />

Tentative foundation plan of the pump, motor, discharge head and sole plate,<br />

common manifold with individual pump discharge pipes etc. are shown in the<br />

layout drawing. The <strong>Bid</strong>der shall furnish the details of the foundation of the pump<br />

motor sets from the pump manufacturer. The foundation pockets of the pump-motor<br />

sets are to be constructed in the civil works matching with the foundation details to<br />

be had from the pump manufacture within the terms of the contract. Similarly the<br />

equipment load data as may be required for civil construction shall also be arranged<br />

by the contractor from the pump manufacturer. The offered pumps motors and other<br />

equipments shall match the stated requirements (foundation plan, total available<br />

floor area, minimum height of crane with minimum hook clearance over floor etc.)<br />

as shown in the layout drawing and a line of confirmation for the same shall be<br />

furnished with the technical offer.<br />

The H.T/L.T. Power, control and signal cables from the respective switch/breaker/<br />

electrical outlets shall be partially within metallic tray/hangers in the pump house<br />

enclosure. All cable laying, supply, fixing of cable trays/hangers as required shall<br />

lie in the scope of this job.<br />

DTS : Detailed Tender Specification. Page 273