The system may also demand for solo pump operation in varying level conditions of<br />
the sump and the pumps shall be suitable for solo as well as parallel operation for<br />
future requirement. The pump duty point shall be considered at the individual pump<br />
flow of the combined station flow by 2 pumps. However, the pumps shall be<br />
suitable for continuous operation both solo and 2 pumps in parallel mode.<br />
The RCC sump and pump house shall have a provision of installing 1 more<br />
horizontal split casing pump sets so as to feed the water to the storage reservoir. The<br />
rising main of 300mm dia. shall transport the water for the present and future<br />
demand. Thus in future, there shall be an additional pump set where 2 shall be in<br />
operation and working and 1 standby system to meet the future demand as stated<br />
above.<br />
23.2 Scope of Electro mechanical works.<br />
The Scope of Work covers selection, manufacture, testing at manufacturer’s works,<br />
supply and delivery to store at project site properly packed for transportation on<br />
F.O.R site basis, receiving at store and site including loading and unloading at all<br />
terminal points, safe storage, installation, pre-commissioning activities, trial run,<br />
commissioning, field testing, operation and maintenance for a period of 3 months of<br />
the plant with all associated equipments and ancillaries. All electro-mechanical<br />
components of the pump house including pumps, motor, starters, H.T./L.T. Panel<br />
boards, pipes, valves and specials, overhead crane and trolley etc. shall be under the<br />
scope of this tender. Both suction and delivery valves inside the pump house shall<br />
be butterfly valves with motorized actuator and position indicator. Arrangement of<br />
feeding H.T./L.T., 3 phase A.C. Power supply to the H.T./L.T. Panel Board in the<br />
Pump House shall not however be under the scope of this tender and the same shall<br />
be arranged separately by the employer/owner. Civil construction of the RCC sump<br />
& pump house including laying of the Rising Main for lifting the water into storage<br />
reservoir of Zone X<strong>II</strong> in which the pumps shall be installed and commissioned is<br />
detailed out elsewhere in this document. Motor and other associated equipments<br />
shall be compatible with VVVF drives including automation control and<br />
visualization system. VVF drives and PLC system is however outside the scope of<br />
this tender.<br />
It is the responsibility of <strong>Bid</strong>der to have thorough understanding of reference<br />
document, site condition and specifications. The intending <strong>Bid</strong>der shall be deemed<br />
to have visited the site, studied the condition, collected relevant and required data<br />
before submitting the bid to make the bid complete and correct in all respect. Nonfamiliarity<br />
with the site condition will not be considered a reason either for extra<br />
claim or for not carrying out the work in strict conformity with the<br />
specifications/acts/code of practices/rules and regulations of local Electrical<br />
inspectorate.<br />
<strong>Bid</strong>der shall be responsible and assist client in obtaining all statutory clearance as<br />
required from Statutory Authority.<br />
DTS : Detailed Tender Specification. Page 272