Chapter 23<br />

Technical specification for electro-mechanical Plants,<br />

equipments and accessories for Clear water pumping station.<br />

23.1 Intent and Requirement.<br />

Intent :<br />

The intent of the tender is to select, manufacture, testing at Manufacturers’ works,<br />

supply and delivery in duly packed condition F.O.R project site, installation,<br />

commissioning of horizontal split casing pumping sets with accessories installed in<br />

the Clear Water pumping station with other equipments, field testing, operation and<br />

maintenance etc. as per the technical specification and other terms and conditions.<br />

The horizontal split casing Clear Water pumping sets shall be installed to lift<br />

4.36Mld of water to the storage reservoir under Zone X<strong>II</strong>.<br />

Source and Pump House :<br />

The source of water shall be the storage reservoir at 6 th Mile, Upper Shillong which<br />

shall receive and collect the water transmitted from the WTP which is about 13Km<br />

away. The Clear Water RCC Sump and Pump House is proposed to be constructed<br />

near the storage reservoir. Horizontal split casing pumping sets shall be installed in<br />

the Pump House. Under the scope of this tender the electrical control switches<br />

H.T/L.T. Board, indication and metering, instrumentation etc. shall be housed in the<br />

Pump House to be constructed for the purpose.<br />

Present Phase and Future Phase Requirement :<br />

There shall be total 2 nos. horizontal split casing pumps of identical type for the<br />

present phase and the same shall be operated as one pump and shall deliver the<br />

station flow of 4.36 MLD in 20 Hrs. of operation by 1 pump. Raw water shall be<br />

transported from the Clear Water pumping station to the storage reservoir for Zone<br />

X<strong>II</strong> through a 300mm DI rising main pipe having approximate length of 6570Rm.<br />

The different levels in the proposed RCC Sump at clear water pumping station and<br />

the storage reservoir of Zone X<strong>II</strong> have been indicated in the document based on<br />

which the <strong>Bid</strong>der shall calculate the pump working heads at different conditions. To<br />

calculate the frictional head loss in straight pipe, Hazen William’s formula taking<br />

‘C’ value as 100 shall be considered. In order to estimate the frictional head loss for<br />

bends, curves, valves, specials etc. in the Clear Water rising Main an increment of<br />

20% on the calculated frictional head loss of the rising main shall be considered.<br />

DTS : Detailed Tender Specification. Page 271