Construction Camps :The Contractor shall take adequate measures such as<br />

provision of septic tank/pit latrines at construction site/camps. The Contractor shall<br />

provide crèches to working women labour. The Contractor shall provide drinking<br />

water conforming to IS:10500-1991.<br />

The Contractor shall provide garbage can at suitable fixed place and the garbage<br />

shall be disposed off regularly.<br />

Aesthetic Improvement: The Contractor shall through proper house keeping<br />

enhance aesthetic appearance of construction sites. The Contractor shall dispose-off<br />

construction wastes at approved disposal sites. The Contractor shall repair<br />

pavements immediately following construction of pipeline and appurtenant<br />

structures.<br />

The Contractor shall remove after completion of construction, all temporary<br />

structures and restore the project and surrounding areas nearest possible to the<br />

reconstruction condition.<br />

Conservation of Ecological Resources: The Contractor shall not use farmland and<br />

forest belts as materials borrow sites. The Contractor shall not select arable land as<br />

material borrow site. In case excavation in arable land is unavoidable, topsoil layer<br />

(30cms depth) shall be saved and returned after construction work is completed so<br />

as to minimize impacts on ecosystem, agriculture and animal husbandry. The<br />

Contractor shall educate construction workers to protect natural resources, wild<br />

plants and animals.<br />

1.37 Use of trade names.<br />

Wherever reference is made in the contract to specific manufacturers or trade names<br />

the Contractor shall be entitled to substitute Plant and materials supplied by other<br />

manufacturers or producers. Such substitution shall be to the approvals of the<br />

Engineer, which will not be unreasonably withheld. At the request of the Engineer<br />

the Contractor shall provide information to establish that the substituted Plant and<br />

materials are equivalent or better than those referred to.<br />

1.38 Direction by the engineer.<br />

The Contractor is responsible for all activities relating to the construction of the<br />

works. Any reference in this Specification to the Engineer directing or ordering,<br />

prescribing etc. the Contractor shall be deemed to mean “Contractor to propose a<br />

methodology of construction and to submit to the Engineer for approval”. Any such<br />

approval by the Engineer shall not limit the Contractor’s responsibilities relating to<br />

construction of the Works. Notwithstanding this clause the Engineer shall be<br />

entitled to instruct the Contractor whenever the Engineer considers it necessary to<br />

GTS : General Technical Specification. Page 25