Soil Erosion and Water Quality: The Contractor shall ensure that earth and stone do<br />

not silt up existing irrigation/drainage systems. The Contractor shall take suitable<br />

measures to prevent direct discharge of polluted waters from construction activity<br />

into lakes/rivers/irrigation channels.<br />

The Contractor shall minimize exposure of soil types susceptible to wind and water<br />

erosion. The Contractor shall control run-off and erosion through proper drainage<br />

channels and structures.<br />

Soil compaction.<br />

The Contractor shall restrict traffic movements and use low ground pressure<br />

machines. The Contractor shall preserve topsoil to be replaced after completion of<br />

construction activity. The Contractor shall avoid wet soils as far as possible.<br />

Social disruption.<br />

The Contractor shall minimize interruptions to utility services through proper<br />

planning and scheduling of activities. The Contractor shall provide temporary roads<br />

and diversions as may be necessary for smooth flow of traffic and people.<br />

Dust/air pollution.<br />

The Contractor shall provide effective dust control through sprinkling/washing of<br />

construction sites and access roads. The Contractor shall cover/water stockpiles and<br />

storage areas to prevent dust pollution. The Contractor shall cover trucks<br />

transporting construction materials to minimize spills. The Contractor shall have a<br />

preventive maintenance programme for construction equipment and vehicles to<br />

meet emission standards. Oil shall not be used to control dust.<br />

Noise Pollution: The Contractor shall normally undertake construction work during<br />

daytime only (between 7.30 to 18.00 hrs.) and when authorised to work beyond<br />

these hours adopt suitable noise control methods during such works. The Contractor<br />

shall maintain machines and trucks to keep them with low noise. The Contractor<br />

shall install sound barriers and plant tree as appropriate during construction. The<br />

Contractor shall monitor the level of noise near the construction site, factory sites<br />

and sensitive areas with the following frequency.<br />

a) During construction period : 12 times a year each time including day and night.<br />

b) During commissioning period : 4 times adhoc monitoring<br />

GTS : General Technical Specification. Page 24