Gusseted bends and tees may be used for the filter pipe work. The completed head<br />

clearance on access ways, sufficient ventilation to avoid excessive condensation and<br />

adequate lighting. GEC exhaust fans shall be installed in filter house and main<br />

machinery hall in sufficient nos. as required.<br />

21.23 Wash water main.<br />

Wash water supply pipe work shall be from the wash water tank provided for this<br />

purpose. In case bidder, want to change this they may give justification adopting the<br />

modified value in the bid.<br />

21.24 Waste water collection and disposal.<br />

To simplify the control of the cleansing process, the filter wash water shall<br />

discharge from filter through piped outlets into open wasted channel running along<br />

the length of the filter battery on the side of filtered water collection channel. The<br />

channel shall be benched to fall. Channel velocities shall be self-cleansing and no<br />

scouring.<br />

21.25 Air scouring equipment.<br />

In the machinery hall, the contractor shall supply two identical electrically driven<br />

rotary air compressors for filter scouring purposes and preferably located above the<br />

level of the filtered water collection channel. Each blower unit shall be of adequate<br />

rating to supply air in the required quantity to efficiently scour one filter bed at a<br />

time. The second blower unit shall act as standby. GEC exhaust fan shall also be<br />

provided for proper ventilation. The blowers shall be air cooled and of the double<br />

impeller positive displacement rotary type driven by electric motors and mounted<br />

on a combination bed plate of cast iron or fabricated steel. Anti-vibration mountings<br />

and flexible pipe joints shall be provided.<br />

Each blower shall be complete with automatic unloading device, dead weight<br />

pressure relief valves pressure gauges, inlet air filters and suitable in all respects for<br />

automatic operation.<br />

The driver between the blowers and motors shall be through flexible pin and buffer<br />

coupling or of the vee rope type of approved design. The Impellers shall be of cast<br />

steel, machined to an accurate contour, together with an integral shaft, and shall be<br />

statically and dynamically balanced. The Blower shall run at maximum speed of<br />

1000 rpm.<br />

DTS : Detailed Tender Specification. Page 254